OpenLegislation

Paragraph 5 I1

England and Wales

(1)

Any facilities used for the temporary storage of slurry before it is transferred to a slurry storage tank shall have adequate capacity to store the maximum quantity of slurry which (disregarding any slurry which will be transferred directly into a slurry storage tank) is likely to be produced on the premises in any two day period F1or such smaller capacity as the Agency may agree in writing is adequate to avoid any significant risk of pollution of controlled waters.

(2)

Where slurry flows into a channel before discharging into a reception pit and the flow of slurry out of the channel is controlled by means of a sluice, the capacity of the reception pit shall be adequate to store the maximum quantity of slurry which can be released by opening the sluice.

Annotations

Textual amendments

F1

Words in Sch. 2 para. 5(1) added (1.4.1997) by The Control of Pollution (Silage, Slurry and Agricultural Fuel Oil) (Amendment) Regulations 1997 (S.I. 1997/547), regs. 1, 2(9)(a)

Commencement

I1

Sch. 2 para. 5 in force at 1.9.1991, see reg. 1