OpenLegislation

Paragraph 9 I1

England and Wales

Where the walls of the slurry storage tank are not impermeable, the base of the tank shall extend beyond its walls and shall be provided with channels designed and constructed so as to collect any slurry which may escape from the tank and adequate provision shall be made for the drainage of the slurry from those channels to an effluent tank through a channel or pipe.

Annotations

Commencement

I1

Sch. 2 para. 9 in force at 1.9.1991, see reg. 1