Paragraph 103 I1
England and Wales
In this Part of this Schedule—
“the Agency” means the Environment Agency;
“construction” includes execution, placing, altering, replacing, relaying and removal and excavation and “construct” and “constructed” must be construed accordingly;
“drainage work” means any main river and includes any land which provides flood storage capacity for any main river and any bank, wall, embankment or other structure, or any appliance, constructed or used for land drainage, flood defence or tidal monitoring;
“fishery” means any waters containing fish and fish in, or migrating to or from, such waters and the spawn, spawning ground, habitat or food of such fish;
“main river” has the same meaning given in section 113 of the Water Resources Act 1991;
“plans” includes sections, drawings, specifications, calculations and method statements;
“remote defence” means any berm, wall or embankment that is constructed for the purposes of preventing or alleviating flooding from, or in connection with, any main river; and
“specified work” means so much of any work or operation authorised by this Order as is in, on, under, over or within—
- (a)
8 metres of the base of a remote defence which is likely to—
- (i)
endanger the stability of, cause damage or reduce the effectiveness of that remote defence; or
- (ii)
interfere with the Agency’s access to or along that remote defence;
- (i)
- (b)
16 metres of a drainage work involving a tidal main river or 8 metres of a drainage work involving a non-tidal main river; or
- (c)
any distance of a drainage work and is otherwise likely to—
- (i)
affect any drainage work or the volumetric rate of flow of water in or flowing to or from any drainage work;
- (ii)
affect the flow, purity or quality of water in any main river or other surface waters;
- (iii)
cause obstruction to the free passage of fish or damage to any fishery;
- (iv)
affect the conservation, distribution or use of water resources; or
- (v)
affect the conservation value of the main river and habitats in its immediate vicinity;
- (i)
or which involves—
- (d)
an activity that includes dredging, raising or taking of any sand, silt, ballast, clay, gravel or other materials from or off the bed or banks of a drainage work (or causing such materials to be dredged, raised or taken), including hydrodynamic dredging or desilting; and
- (e)
any quarrying or excavation within 16 metres of a drainage work which is likely to cause damage to or endanger the stability of the banks or structure of that drainage work.
- (a)
Annotations
Commencement
- I1
Sch. 15 para. 103 in force at 27.9.2024, see art. 1