Paragraph 154 I1
England and Wales
In this Part of this Schedule—
-
“apparatus” means the cables, structures or other infrastructure owned, occupied or maintained by West Burton or its successor in title within the West Burton Work No. 5B Area;
-
“construction” includes execution, placing, altering, replacing, reconstruction, relaying, maintenance, extensions, enlargement and removal; and “construct” and “constructed” must be construed accordingly;
-
“plans” includes sections, drawings, specifications, designs, design data, software, soil reports, calculations, descriptions (including descriptions of methods of construction), staging proposals, programmes and details of the extent, timing and duration of any proposed occupation of the West Burton Work No. 5B Area;
-
“specified works” means so much of any works of operations authorised by this Order (or authorised by any planning permission intended to operate in conjunction with this Order) as is—
- (a)
within the West Burton Work No. 5B Area;
- (b)
in, on, under, over or within 25 metres of the proposed West Burton Work No. 5B Area or any apparatus; or
- (c)
may in any way adversely affect any apparatus.
- (a)
-
“West Burton” means an undertaker with the benefit of all or part of the West Burton Solar Project Order for the time being; and
-
“West Burton Work No. 5B Area” means the area for Work No. 5B authorised in the West Burton Solar Project Order.
Annotations
Commencement
- I1
Sch. 15 para. 154 in force at 27.9.2024, see art. 1