The Council of the City of York (Hungate Bridge) Scheme 2009 Confirmation Instrument 2010

S.I. 2010/1508 · Made 24 May 2010

Original text. legislation.gov.uk does not revise statutory instruments, so later amendments are not shown here. Changes made to it are listed under each provision when known.

Highways, England

Made 24th May 2010

Coming into force in accordance with article 1

The Secretary of State for Transport makes this Instrument in exercise of powers conferred by section 106(3) of the Highways Act 1980f1 and now vested in the Secretary of Statef2:

Annotations to the whole text

Footnotes

f1

1980 c.66.

f2

SI 1981/238.

Contents

  1. 1Section 1
  2. 2Section 2
  3. 3Section 3
  4. Signature
  5. Schedule THESchedule THE
  6. THE SCHEDULE TO THE SCHEMEPLANS AND SPECIFICATIONS OF THE SCALE LANE BRIDGE
  7. Explanatory note

1

This Instrument may be cited as “The Council of the City of York (Hungate Bridge) Scheme 2009 Confirmation Instrument 2010” and shall come into force on the date on which notice that it has been confirmed is first published in accordance with paragraph 1 of Schedule 2 to the Highways Act 1980.

2

The Council of the City of York (Hungate Bridge) Scheme 2009 (“the Scheme”) is hereby confirmed without modifications.

3

The Scheme as confirmed is set out in the Schedule hereto (including the plans) and copies of the Scheme as modified with its accompanying plans are deposited at the offices of the Department for Transport, Floor 13 (IMD), Ashdown House, St Leonards on Sea, Hastings, East Sussex, TN37 7GA, and at the offices of the Guildhall, York, YO1 9QN.

Signature

Signed by authority of the Secretary of State for Transport

J Blackie

Regional Director

Government Office for the North East

24th May 2010

Schedule THE

The Council of the City of York (hereinafter referred to as “the Council”) makes this Scheme in exercise of its powers under Section 106(3) of the Highways Act 1980.

1

The Council is authorised to construct over the navigable waters of the River Foss the bridge specified in the Schedule to this Scheme as part of the highway which it is proposing to construct between Navigation Road and the Hungate Development in the said City.

2

The Scheme may be cited as the Council of the City of York (Hungate Bridge) Scheme 2009.

THE SCHEDULE TO THE SCHEMEPLANS AND SPECIFICATIONS OF THE SCALE LANE BRIDGE

The location and general design of the Bridge are shown on the plans numbered 1056/75/35 Rev E, 1056/75/36 Rev C, 1056/75/38 and the contextual drawing all marked “The Council of the City of York (Hungate Bridge) Scheme 2009” sealed with the Common Seal of the Council and deposited at The Guildhall, York, YO1 9QN (the offices of the Council) and of the Secretary of State for Transport.

Explanatory note

(This note is not part of the Instrument)

This instrument confirms a scheme to construct over the navigable waters of the River Foss a bridge as part of the highway which it is proposing to construct between Navigation Road and the Hungate Development, York.

A regulatory impact assessment has not been produced for this instrument as it has no significant impact on business, charities or voluntary bodies.