Schedule 1 SCHEDULED WORKS
-
Work No. 1 — A railway, comprising a reception siding and headshunt, commencing by a junction with the eastbound Crossrail railway line authorised by Work No. 1/7 in Schedule 1 to the principal Actf1 at a point 15 metres north-west of the former level crossing of Churchmanor Way and the North Kent railway, passing westwards and terminating at a point 48 metres west of the bridge carrying the North Kent railway over White Hart Road.
-
Work No. 2 — A railway, comprising sidings to provide a stabling and maintenance depot, commencing by a junction with Work No. 1 at a point 222 metres east of the bridge carrying the North Kent railway over White Hart Road, passing north-eastwards and terminating at a point 305 metres north-west of the former level crossing of Churchmanor Way and the North Kent railway.
The work includes an accommodation building and a maintenance building within the depot site.
Annotations
Footnotes
- f1