Article 9 Amendment to Part 3 (Requirements) of Schedule 1 (Authorised Project)
Schedule 1 (Authorised Project), Part 3 (Requirements), paragraph 25 is amended as follows—
in paragraph 25(1)—
for “Work No. 7” substitute “the Project A converter station”;
after “must”, delete “each or together”;
after “35 decibels”, insert “(including when taken as a whole with the Project B converter station)”.
after paragraph 25(1) insert—
“(1A)The noise emanating from the operation of the Project B converter station (including transformers, cooling fans, switch gear and power lines) must not exceed operational noise levels of 35 decibels (including when taken as a whole with the Project A converter station) as given in BS4142 at the nearest receptors identified on the works plans as follows (with grid references shown as easting: northing)—
(a)Halfway House (504796; 436331);
(b)Model Farm (504011; 436576);
(c)Poplar Farm (503727; 435672); and
(d)Wanlass Farm (504385; 435168).”;
in paragraph 25(3), after “in relation to the”, insert “Project A”;
after paragraph 25(3) insert—
“(3A)All standby generator testing in relation to the Project B onshore works must be undertaken between 9 a.m. and 5 p.m. on Monday to Saturday, and not at all on Sundays or public or bank holidays, unless otherwise agreed in writing with the relevant planning authority.”.