Offshore works

Work No. 1A—

(a)

an offshore wind turbine generating station with a gross electrical output of over 100 megawatts comprising up to 100 wind turbine generators each fixed to the seabed by monopile or jacket foundations; and

(b)

a network of HVAC subsea cables connecting the wind turbine generators and Work No. 2A within the area shown on the works plans, including cable crossings and cable protection;

and associated development within the meaning of section 115(2) (development for which development consent may be granted) of the 2008 Act comprising—

Work No. 2A—

(a)

up to one offshore converter platform fixed to the seabed by jacket or monopile foundations within the area shown on the works plans; and

(b)

a network of subsea inter-platform cabling within the area shown on the works plans, including cable crossings and cable protection;

Work No. 3A—

(a)

up to two HVDC subsea export cables between Work Nos. 2A and 8A along routes within the area shown on the works plans including cable crossings and cable protection;

(b)

up to two cables for the transmission of fibre optic communications laid between Work Nos. 2A and 8A consisting of cables along routes within the area shown on the works plans including cable crossings and cable protection;

(c)

up to three temporary pits for trenchless cable installation at landfall seaward of MLWS and up to three additional temporary pits (if required) for trenchless cable installation at landfall seaward of MLWS for the DBS West Project within the area shown on the works plans;

(d)

installation of up to three landfall cable ducts (if required) and up to three additional landfall cable ducts (if required) for the DBS West Project within the area shown on the works plans; and

(e)

installation of up to three cable duct extensions from below MLWS to any temporary pits created for trenchless installation situated between MHWS and MLWS, up to three additional cable duct extension (if required) for the DBS West Project from MLWS to any temporary pits created for trenchless cable installation situated between MHWS and MLWS;

Work No. 4A—

Up to one accommodation platform fixed to the seabed by jacket or monopile foundations within the area shown on the works plans;

Work No. 5A—

Up to three HVAC subsea export cables linking Work Nos. 2A and 2B providing an electrical connection between Work Nos. 1A and 1B, including cable crossings and cable protection;

Work No. 6A—

Not used;

Work No. 7A—

A temporary work area associated with Work Nos. 1A to 5A for vessels to carry out intrusive activities and non-intrusive activities alongside Work Nos. 1A to 5A;