Paragraph 31 Post-construction monitoring and surveys
The undertaker must, in discharging condition 24(1)(b), submit details (which accord with the in principle monitoring plan) for approval in writing by the MMO in consultation with relevant statutory nature conservation bodies of proposed post-construction monitoring and surveys, including methodologies and timings, and a proposed format, content and timings for providing reports on the results.
The survey proposals must specify each survey’s objectives and explain how it will assist in either informing a useful and valid comparison with the pre-construction position and/or will enable the validation or otherwise of key predictions in the environmental statement.
The post-construction surveys referred to in sub-paragraph (1) must, unless otherwise agreed in writing with the MMO, have due regard to, but not be limited to, the need to—
undertake a survey to determine any change in the location, extent and composition of any habitats of principal importance, Annex I subtidal habitat, habitat with suitability for sandeel or surficial deposits of glacial till identified in the pre-construction survey in the parts of the Order limits in which construction works were carried out. The survey design must be informed by the results of the pre-construction benthic survey and the construction benthic surveys;
undertake, within 12 months of completion of the licensed activities, a full sea floor coverage swath-bathymetry survey to IHO Order 1a standard that meets the requirements of MGN654 and its annexes, and side scan sonar, of the area(s) within the Order limits in which construction works were carried out to assess any changes in bedform topography and such further monitoring or assessment as may be agreed to ensure that cables (including fibre optic cables) have been buried or protected;
undertake any monitoring required by the SIP submitted in accordance with condition 25;
undertake post-construction vessel traffic monitoring in accordance with the outline vessel traffic monitoring plan by automatic identification system for a duration of three consecutive years following the completion of construction of the authorised project, unless otherwise agreed in writing by the MMO, with provision for a report to be submitted annually to the MMO, Trinity House and the MCA; and
undertake any marine mammal monitoring referred to in the marine mammal mitigation protocol submitted in accordance with condition 24(1)(g).
The undertaker must carry out the surveys agreed under sub-paragraph (1) and provide the agreed reports to the MMO in the agreed format in accordance with the agreed timetable, unless otherwise agreed in writing with the MMO in consultation with the relevant statutory nature conservation bodies.
In the event that the reports provided to the MMO under sub-paragraph (4) identify a need for additional monitoring, the requirement for any additional monitoring will be agreed with the MMO in writing and implemented as agreed.
All monitoring reports must be made publicly available and submitted to relevant evidence databases (as agreed with the MMO) no later than six months following written approval of the relevant report by the MMO under this condition, unless otherwise agreed in writing by the MMO.