Paragraph 1 Interpretation

Original text. Later amendments are not shown.

(1)

In this licence—

  • “the 2004 Act” means the Energy Act 2004;

  • “the 2008 Act” means the Planning Act 2008;

  • “the 2009 Act” means the Marine and Coastal Access Act 2009;

  • “the 2017 Regulations” means the Conservation of Offshore Marine Habitats and Species Regulations 2017;

  • “Annex I subtidal habitat” means a subtidal habitat of a type listed in Annex I to Council Directive 92/43/EEC on the conservation of natural habitats and of wild fauna and flora;

  • “array area” means the area covered by Work No. 1B as shown on the offshore works plan;

  • “array cable” means a cable linking the wind turbine generators to each other and to the offshore converter platforms;

  • “authorised deposits” means the substances and articles specified in paragraph 4 of Part 1 of this licence;

  • “authorised project” means the development and associated development described in Part 1 of Schedule 1 (authorised development) of the Order and any other development authorised by the Order that is development within the meaning of section 32 (meaning of “development”) of the 2008 Act;

  • “authorised scheme” means Work No. 1B, 4B and 7B and the further associated development described in paragraph 3 of Part 1 of this licence or any part of that work or development;

  • “buoy” means any floating device used for navigational purposes or measurement purposes including LiDAR buoys, wave buoys and guard buoys;

  • “cable” means any offshore cable and includes direct-lay cables and cables laid in cable ducts and further includes fibre optic and other communications cables either within the cable or laid alongside;

  • “cable crossing” means the crossing of existing subsea cables and pipelines by the array, inter-platform or export cables authorised by the Order and forming part of the authorised scheme together with physical protection measures including cable protection;

  • “cable protection” means measures to protect cables forming part of the authorised scheme from physical damage and exposure due to loss of seabed sediment including, but not limited to, rock placement, concrete mattresses with or without frond devices, protective aprons or coverings, bagged solutions filled with sand, rock, grout or other materials and protective shells;

  • “cable statement” means the document certified by the Secretary of State as the cable statement for the purposes of the Order under article 42 (certification of plans and documents, etc.) and referenced in Schedule 19 (documents to be certified);

  • “commence” means the first carrying out of any licensed marine activities authorised by this licence, save for pre-construction monitoring surveys approved under this licence, and “commenced” and “commencement” must be construed accordingly;

  • “condition” means a condition in Part 2 of this licence;

  • “DBS East” means the Dogger Bank South East Offshore Wind Farm;

  • “DBS East Project” means the DBS East Project offshore works and the DBS East Project onshore works;

  • “DBS East Project offshore works” means Work Nos. 1A to 8A and any other authorised development associated with those works;

  • “DBS East Project onshore works” means Work Nos. 9A to 34A and any other authorised development associated with those works;

  • “DBSEL” means RWE Renewables UK Dogger Bank South (East) Limited, company number 13656240, whose registered office is Windmill Hill Business Park, Whitehill Way, Swindon, Wiltshire, England, SN5 6PB;

  • “DBS West Project offshore works” means Work Nos. 1B to 8B and any authorised development associated with those works;

  • “DBS West Project” means the DBS West Project onshore works and the DBS West Project offshore works;

  • “DBS West Project onshore works” means Work Nos. 9B to 34B and any other authorised development associated with those works;

  • “DBSWL” means RWE Renewables UK Dogger Bank South (West) Limited, company number 13656525, whose registered office is Windmill Hill Business Park, Whitehill Way, Swindon, Wiltshire, England, SN5 6PB;

  • “Defence Infrastructure Organisation Safeguarding” means Ministry of Defence Safeguarding, Defence Infrastructure Organisation, Kingston Road, Sutton Coldfield, West Midlands, B75 7RL and any successor body to its functions;

  • “disposal ground 2 (DBS West)” means the site to be used for disposal of inert material of natural origin produced during construction drilling and seabed preparation for foundation works and cable sandwave clearance for the DBS West Project offshore works as shown on the Disposal Site Plan and with MMO disposal site reference DG035;

  • “Disposal Site Plan” means the plan certified by the Secretary of State as the Disposal Site Plan for the purposes of the Order under article 42 (certification of plans and documents, etc.) and referenced in Schedule 19 (documents to be certified);

  • “Dropped Object Procedure Form” means the MMO notification proforma with reference MLDIR1 for reporting the loss or dumping of synthetic materials and other refuse at sea or any other format advised in writing by the MMO;

  • “environmental statement” means the document certified by the Secretary of State as the environmental statement for the purposes of the Order under article 42 (certification of plans and documents, etc.) and referenced in Schedule 19 (documents to be certified);

  • “habitats of principal importance” means a habitat designated as being of principal importance in accordance with section 41 (biodiversity lists and action (England)) of the Natural Environment and Rural Communities Act 2006;

  • “HAT” means highest astronomical tide;

  • “HVAC” means high voltage alternating current;

  • “HVDC” means high voltage direct current;

  • “IHO Order 1a standard” means order 1a from the sixth edition of the International Hydrographic Organisation’s Standards for Hydrographic Surveys as updated or amended from time to time;

  • “in principle monitoring plan” means the document certified by the Secretary of State as the in principle monitoring plan for the purposes of the Order under article 42 (certification of plans and documents, etc.) and referenced in Schedule 19 (documents to be certified);

  • “in principle Site Integrity Plan for the Southern North Sea Special Area of Conservation” means the document certified by the Secretary of State as the in principle Site Integrity Plan for the Southern North Sea Special Area of Conservation for the purposes of the Order under article 42 (certification of plans and documents, etc.) and referenced in Schedule 19 (documents to be certified);

  • “inter-platform cable” means a cable linking the offshore converter platforms;

  • “intrusive activities” means activities including anchoring of vessels, jacking up of vessels, and temporary wet storage areas;

  • “jacket foundation” means a lattice type structure constructed of steel which is fixed to the seabed at 3 or more points with steel pin piles and associated equipment including scour protection, J-tubes, corrosion protection systems and access platforms;

  • “JNCC Guidance” means the statutory nature conservation body ‘Guidance for assessing the significance of noise disturbance against Conservation Objectives of harbour porpoise SACs’ Joint Nature Conservation Committee Report No. 654, May 2020 published in June 2020 as amended, updated or superseded from time to time;

  • “LAT” means lowest astronomical tide;

  • “maintain” includes inspect, upkeep, repair, adjust, alter, remove, reconstruct and replace (including replenishment of cable protection), but does not include the removal, reconstruction or replacement of foundations associated with the authorised scheme, to the extent assessed in the environmental statement; and “maintenance” must be construed accordingly;

  • “Marine Management Organisation” means the body created under the 2009 Act which is responsible for the regulation of this licence or any successor of that function and “MMO” must be construed accordingly;

  • “Marine Noise Registry” means the database developed and maintained by JNCC on behalf of Defra to record the spatial and temporal distribution of impulsive noise generating activities in UK seas;

  • “MCA” means the Maritime and Coastguard Agency, the executive agency of the Department for Transport;

  • “MCMS” means the Marine Case Management System web portal provided and operated by the MMO;

  • “mean sea level” means the average level of the sea surface over a period of time, taking account of all tidal effects and surge events;

  • “MHWS” or “mean high water springs” means the average throughout the year of two successive high waters during a 24-hour period in each month when the range of the tide is at its greatest (Spring tides);

  • “MLWS” or “mean low water springs” means the lowest level that spring tides reach on average over a period of time;

  • “monopile foundation” means a steel pile driven or drilled into the seabed and associated equipment including scour protection, J-tubes, corrosion protection systems and access platforms and equipment;

  • “offshore accommodation platform” means a structure above LAT and attached to the seabed by means of a foundation, with one or more decks and open with modular equipment or fully clad and may include a helicopter platform, containing accommodation, storage, workshop auxiliary equipment and facilities for operating, maintaining and controlling the offshore converters or wind turbine generators, including but not limited to navigation, aviation and safety marking and lighting, systems for vessel access and retrieval, cranes, potable water supply, black water separation, stores, fuels and spares, communications systems and control hub facilities;

  • “offshore converter platform” means an offshore converter platform with equipment to convert the HVAC power generated at the wind turbine generators into HVDC power, being a structure above LAT and attached to the seabed by means of a foundation, with one or more decks and open with modular equipment or fully clad and may include a helicopter platform, containing electrical equipment required to switch, transform, convert electricity generated at the wind turbine generators to a higher voltage and provide reactive power compensation, including but not limited to high voltage power transformers, high voltage switchgear and busbars, substation auxiliary systems and low voltage distribution, instrumentation, metering equipment and control systems, standby generators, shunt reactors, auxiliary and uninterruptible power supply systems, facilities to support operations and maintenance;

  • “offshore order limits and grid coordinates plan” means the plan certified by the Secretary of State as the offshore order limits and grid coordinates plan for the purposes of the Order under article 42 (certification of plans and documents, etc.) and referenced in Schedule 19 (documents to be certified);

  • “Order” means the Dogger Bank South East and West Offshore Wind Farms Order 2026;

  • “Order limits” means the limits shown on the offshore order limits and grid coordinates plans within which the authorised scheme may be carried out and the grid coordinates for Work Nos. 1B, 4B and 7B are set out in paragraph 5 of Part 1 of this licence;

  • “outline fisheries liaison and co-existence plan” means the document certified by the Secretary of State as the outline fisheries liaison and co-existence plan for the purposes of the Order under article 42 (certification of plans and documents, etc.) and referenced in Schedule 19 (documents to be certified);

  • “outline marine mammal mitigation protocol” means the document certified by the Secretary of State as the outline marine mammal mitigation protocol for the purposes of the Order under article 42 (certification of plans and documents, etc.) and referenced in Schedule 19 (documents to be certified);

  • “outline offshore operations and maintenance plan” means the document certified by the Secretary of State as the outline offshore operations and maintenance plan for the purposes of the Order under article 42 (certification of plans and documents, etc.) and referenced in Schedule 19 (documents to be certified);

  • “outline project environmental management plan” means the document certified by the Secretary of State as the outline project environmental management plan for the purposes of the Order under article 42 (certification of plans and documents, etc.) and referenced in Schedule 19 (documents to be certified);

  • “outline scour protection plan” means the document certified by the Secretary of State as the outline scour protection plan for the purposes of the Order under article 42 (certification of plans and documents, etc.) and referenced in Schedule 19 (documents to be certified);

  • “outline vessel traffic monitoring plan” means the document certified by the Secretary of State as the outline vessel traffic monitoring plan for the purposes of the Order under article 42 (certification of plans and documents, etc.) and referenced in Schedule 19 (documents to be certified);

  • “outline written scheme of investigation (offshore)” means the document certified by the Secretary of State as the outline written scheme of investigation (offshore) for the purposes of the Order under article 42 (certification of plans and documents, etc.) and referenced in Schedule 19 (documents to be certified);

  • “scour protection” means measures to prevent loss of seabed sediment around any structure placed in or on the seabed including by the use of bagged solutions, filled with grout or other materials, protective aprons, concrete mattresses with or without frond devices, and rock and gravel placement;

  • “statutory historic body” means Historic England or its successor in function;

  • “statutory nature conservation body” means a statutory nature conservation body, being the appropriate nature conservation body as defined in Regulation 5 of the Conservation of Habitats and Species Regulations 2017f1 or its equivalent in the Conservation of Offshore Marine Habitats and Species Regulations 2017f2;

  • “transition piece” means a metal structure attached to the top of a foundation where the base of a wind turbine generator is connected and includes additional equipment such as J-tubes, corrosion protection systems, boat access systems, access platforms, craneage, electrical transmission equipment and associated equipment;

  • “Trinity House” means the Corporation of Trinity House of Deptford Strond;

  • “UKHO” means the United Kingdom Hydrographic Office of Admiralty Way, Taunton, Somerset, TA1 2DN;

  • “undertaker” means DBSWL;

  • “vessel” means every description of vessel, however propelled or moved, and includes a non-displacement craft, a personal watercraft, a seaplane on the surface of the water, a hydrofoil vessel, a hovercraft or any other amphibious vehicle and any other thing constructed or adapted for movement through, in, on or over water and which is at the time in, on or over water;

  • “VHF” means very high frequency;

  • “wind turbine generator” means a structure comprising a tower, a rotor with three blades connected at the hub, a nacelle and ancillary electrical and other equipment which may include J-tubes, transition piece, access and rest platforms, access ladders, boat access systems, corrosion protection systems, fenders and maintenance equipment, helicopter landing facilities and other associated equipment, fixed to a foundation and forming part of the authorised scheme;

  • “works plans” means the works plans (offshore) and the works plans (onshore);

  • “works plans (offshore)” means the plans certified by the Secretary of State as the works plans (offshore) for the purposes of the Order under article 42 (certification of plans and documents, etc.) and referenced in Schedule 19 (documents to be certified);

  • “works plans (onshore)” means the plans certified by the Secretary of State as the works plans (onshore) for the purposes of the Order under article 42; and (certification of plans and documents, etc.) and referenced in Schedule 19 (documents to be certified).

(2)

In this licence, a reference to any statute, order, regulation or similar instrument is a reference to a statute, order, regulation or instrument as amended by any subsequent statute, order, regulation or instrument or as contained in any subsequent re-enactment.

(3)

In this licence, unless otherwise indicated—

(a)

all times are Greenwich Mean Time;

(b)

all coordinates are latitude and longitude degrees and minutes to two decimal places.

(4)

Unless otherwise stated or agreed with the MMO, all submissions, notifications and communications must be sent by the undertaker to the MMO using MCMS. Except where otherwise notified in writing by the relevant organisation, the addresses for correspondence for the purposes of this licence are—

(a)

Historic England

37 Tanner Road

York

YO1 6WP

(b)

Marine Management Organisation

Marine Licensing Team

Lancaster House

Hampshire Court

Newcastle upon Tyne

NE4 7YH

Email: [email protected]

Tel: 0300 123 1032

(c)

Marine Management Organisation (local office)

Room 13, Ground Flood

Crosskill House

Mill Lane

Beverley

HU17 9JB

Tel: 0208 026 0519

(d)

Maritime and Coastguard Agency

UK Technical Services Navigation

Spring Place

105 Commercial Road

Southampton

SO15 1EG

Tel: 020 3817 2433

Email: [email protected]

(e)

Natural England

Foss House

Kings Pool

1-2 Peasholme Green

York

YO1 7PX

Tel: 0300 060 4911

(f)

Trinity House

Tower Hill

London

EC3N 4DH

Tel: 020 7481 6900

(g)

United Kingdom Hydrographic Office

Admiralty Way

Taunton

Somerset

TA1 2DN

Tel: 01823 337 900

(5)

Unless otherwise advised in writing by the MMO, the address for electronic communication with the MMO for the purposes of this licence is [email protected], or where contact to the Local Office of the MMO is required, [email protected].

Annotations

Footnotes

f1

S.I. 2017/1012.

f2

S.I. 2017/1013.