| 7.0 | REP7-022 | Environmental Statement Non-Technical Summary | 2 | June 2025 |
| 7.1 | REP7-024 | Environmental Statement Chapter 1 – Introduction | 2 | June 2025 |
| 7.2 | APP-065 | Environmental Statement Chapter 2 – Need for the Project | 1 | June 2024 |
| 7.3 | REP7-027 | Environmental Statement Chapter 3 – Policy and Legislative Context | 2 | June 2025 |
| 7.4 | REP7-028 | Environmental Statement Chapter 4 – Site Selection & Assessment of Alternatives | 3 | June 2025 |
| 7.5 | REP7-032 | Environmental Statement Chapter 5 – Project Description | 4 | June 2025 |
| 7.6 | APP-076 | Environmental Statement Chapter 6 – Environmental Impact Assessment Methodology | 1 | June 2024 |
| 7.7 | APP-079 | Environmental Statement Chapter 7 – Consultation | 1 | June 2024 |
| 7.8 | REP7-035 | Environmental Statement Chapter 8 – Marine Physical Environment | 2 | June 2025 |
| 7.9 | REP7-038 | Environmental Statement Chapter 9 – Benthic and Intertidal Ecology | 2 | June 2025 |
| 7.10 | REP7-042 | Environmental Statement Chapter 10 – Fish and Shellfish Ecology | 2 | June 2025 |
| 7.11 | REP7-045 | Environmental Statement Chapter 11 – Marine Mammals | 2 | June 2025 |
| 7.12 | REP6-015 | Environmental Statement Chapter 12 – Offshore Ornithology | 4 | June 2025 |
| 7.13 | REP7-048 | Environmental Statement Chapter 13 – Commercial Fisheries | 2 | June 2025 |
| 7.14 | REP7-051 | Environmental Statement Chapter 14 – Shipping and Navigation | 2 | June 2025 |
| 7.15 | REP7-056 | Environmental Statement Chapter 15 – Aviation and Radar | 2 | June 2025 |
| 7.16 | REP7-060 | Environmental Statement Chapter 16 – Infrastructure and Other Users | 4 | June 2025 |
| 7.17 | REP7-062 | Environmental Statement Chapter 17 – Offshore Archaeology and Cultural Heritage | 2 | June 2025 |
| 7.18 | REP7-064 | Environmental Statement Chapter 18 – Terrestrial Ecology and Ornithology | 6 | June 2025 |
| 7.19 | REP6-020 | Environmental Statement Chapter 19 – Geology and Land Quality | 2 | June 2025 |
| 7.20 | REP5-018 | Environmental Statement Chapter 20 – Flood Risk and Hydrology | 3 | May 2025 |
| 7.21 | REP5-022 | Environmental Statement Chapter 21 – Land Use | 4 | May 2025 |
| 7.22 | REP7-073 | Environmental Statement Chapter 22 – Onshore Archaeology and Cultural Heritage | 3 | June 2025 |
| 7.23 | REP7-090 | Environmental Statement Chapter 23 – Landscape and Visual Impact Assessment | 2 | June 2025 |
| 7.24 | REP6-025 | Environmental Statement Chapter 24 – Traffic and Transport | 2 | June 2025 |
| 7.25 | REP6-028 | Environmental Statement Chapter 25 – Noise | 3 | June 2025 |
| 7.26 | REP7-096 | Environmental Statement Chapter 26 – Air Quality | 2 | June 2025 |
| 7.27 | APP-214 | Environmental Statement Chapter 27 – Human Health | 1 | June 2024 |
| 7.28 | APP-217 | Environmental Statement Chapter 28 – Socio-economics | 1 | June 2024 |
| 7.29 | REP6-033 | Environmental Statement Chapter 29 – Tourism and Recreation | 2 | June 2025 |
| 7.30 | REP6-036 | Environmental Statement Chapter 30 – Climate Change | 2 | June 2025 |
| 7.4.1 | REP7-030 | Environmental Statement Chapter 4 – Site Selection and Assessment of Alternatives - Figure 4-1 to Figure 4-37 | 2 | June 2025 |
| 7.5.1 | REP7-034 | Environmental Statement Chapter 5 – Project Description - Figure 5-1 to Figure 5-4 | 3 | June 2025 |
| 7.8.1 | REP7-037 | Environmental Statement Chapter 8 – Marine Physical Environment - Figure 8-1 to Figure 8-13 - Volume 7 | 3 | June 2025 |
| 7.9.1 | REP7-040 | Environmental Statement Chapter 9 - Benthic and Intertidal Ecology - Figure 9-1 to Figure 9-6 | 2 | June 2025 |
| 7.10.1 | REP7-044 | Environmental Statement Chapter 10 – Fish and Shellfish Ecology - Figure 10-1 to Figure 10-10 | 2 | June 2025 |
| 7.11.1 | REP7-047 | Environmental Statement Chapter 11 – Marine Mammals - Figure 11-1 to Figure 11-6 | 2 | June 2025 |
| 7.12.1 | REP6-017 | Environmental Statement Chapter 12- Offshore Ornithology Figure 12-1 to Figure 12-3 | 2 | June 2025 |
| 7.13.1 | REP7-050 | Environmental Statement Chapter 13 – Commercial Fisheries - Figure 13-1 to Figure 13-2 | 2 | June 2025 |
| 7.14.1 | REP7-053 | Environmental Statement Chapter 14 – Shipping and Navigation - Figure 14-1 to Figure 14-7 | 2 | June 2025 |
| 7.15.1 | APP-126 | Environmental Statement Chapter 15 – Aviation and Radar - Figure 15-1 to Figure 15-3 | 1 | June 2024 |
| 7.16.1 | REP7-060 | Environmental Statement Chapter 16 – Infrastructure and Other Users - Figure 16-1 to Figure 16-6 | 4 | June 2025 |
| 7.17.1 | APP-134 | Environmental Statement Chapter 17 – Offshore Archaeology and Cultural Heritage - Figure 17-1 to Figure 17-3 | 1 | June 2024 |
| 7.18.1 | REP7-066 | Environmental Statement Chapter 18 – Terrestrial Ecology and Ornithology - Figure 18-1 to Figure 18-6 | 2 | June 2025 |
| 7.19.1 | REP6-022 | Environmental Statement Chapter 19 – Geology and Land Quality - Figure 19-1 to Figure 19-9 | 4 | June 2025 |
| 7.20.1 | REP5-019 | Environmental Statement Chapter 20 – Flood Risk and Hydrology - Figure 20-1 to Figure 20-6 | 2 | May 2025 |
| 7.21.1 | REP5-024 | Environmental Statement Chapter 21 – Land Use - Figure 21-1 to Figure 21-6 | 3 | May 2025 |
| 7.22.1 | REP7-075 | Environmental Statement Chapter 22 – Onshore Archaeology and Cultural Heritage Figure 22-1 to Figure 22-6 | 2 | June 2025 |
| 7.23.1 | REP4-039 | Environmental Statement Chapter 23 – Landscape and Visual Impact Assessment - Figure 23-1 to Figure 23-17 | 4 | April 2025 |
| 7.24.1 | REP6-027 | Environmental Statement Chapter 24 – Traffic and Transport - Figure 24-1 to Figure 24-5 | 3 | June 2025 |
| 7.25.1 | REP6-030 | Environmental Statement Chapter 25 – Noise - Figure 25-1 | 2 | June 2025 |
| 7.26.1 | REP7-098 | Environmental Statement Chapter 26 – Air Quality - Figure 26-1 to Figure 26-4 | 2 | June 2025 |
| 7.27.1 | APP-215 | Environmental Statement Chapter 27 – Human Health - Figure 27-1 | 1 | June 2024 |
| 7.29.1 | REP6-035 | Environmental Statement Chapter 29 – Tourism and Recreation - Figure 29-1 to Figure 29-3 | 2 | June 2025 |
| 7.4.4.1 | APP-069 | Environmental Statement Appendix 4-1 - Ofgem and National Grid Electricity System Operator Holistic Network Design Statements | 1 | June 2024 |
| 7.4.4.2 | APP-070 | Environmental Statement Appendix 4-2 – Access Strategy Development | 1 | June 2024 |
| 7.4.4.3 | REP7-031 | Appendix 4-3 Onshore Substation Zone Constraints | 1 | June 2025 |
| 7.5.5.1 | APP-073 | Environmental Statement Appendix 5-1 - Project Description Consultation Responses | 1 | June 2024 |
| 7.5.5.2 | REP4-030 | Environmental Statement Appendix 5-2 - Obstacle Crossing Register | 4 | April 2025 |
| 7.5.5.3 | REP2-016 | Environmental Statement Appendix 5-3 - Engineering Drawings | 2 | February 2025 |
| 7.6.6.1 | REP3-009 | Environmental Statement Appendix 6-1 - Onshore Cumulative Effects Assessment Methodology | 2 | March 2025 |
| 7.6.6.2 | APP-078 | Environmental Statement Appendix 6-2 - Offshore Cumulative Effects Assessment Methodology | 1 | June 2024 |
| 7.8.8.1 | APP-082 | Environmental Statement Appendix 8-1 - Marine Physical Environment Consultation Responses | 1 | June 2024 |
| 7.8.8.2 | APP-082 | Environmental Statement Appendix 8-2 - Met Mast Survey Analysis | 1 | June 2024 |
| 7.8.8.3 | REP2-017 | Environmental Statement Appendix 8-3 – Marine Physical Processes Modelling Technical Report | 3 | February 2025 |
| 7.9.9.1 | APP-087 | Environmental Statement Appendix 9-1 - Benthic and Intertidal Ecology Consultation Responses | 1 | June 2024 |
| 7.9.9.2 | APP-088 | Environmental Statement Appendix 9-2 - Intertidal Survey Report | 1 | June 2024 |
| 7.9.9.3 | APP-089 | Environmental Statement Appendix 9-3 - Benthic Ecology Monitoring Report | 1 | June 2024 |
| 7.9.9.4 | APP-090 | Environmental Statement Appendix 9-4 - Environmental Features Report | 1 | June 2024 |
| 7.9.9.5 | REP7-041 | Appendix 9-5 Biotopes and Species of Designated Sites | 1 | June 2025 |
| 7.10.10.1 | APP-093 | Environmental Statement Appendix 10-1 - Fish and Shellfish Ecology Consultation Responses | 1 | June 2024 |
| 7.10.10.2 | APP-094 | Environmental Statement Appendix 10-2 - Fish and Shellfish Ecology Technical Appendix | 1 | June 2024 |
| 7.10.10.3 | | Environmental Statement Appendix 10-3 – Back calculation of the Peak Atlantic Herring Spawning Period | 3 | December 2025 |
| 7.11.11.1 | APP-097 | Environmental Statement Appendix 11-1 - Marine Mammal Consultation Responses | 1 | June 2024 |
| 7.11.11.2 | APP-098 | Environmental Statement Appendix 11-2 – Marine Mammal Information Report | 1 | June 2024 |
| 7.11.11.3 | AS-137 | Environmental Statement Appendix 11-3 - Underwater Noise Modelling Report | 2 | January 2025 |
| 7.11.11.4 | REP5-013 | Environmental Statement Appendix 11-4 Interim Population Consequence of Disturbance Modelling (iPCoD) | 3 | May 2025 |
| 7.11.11.5 | APP-101 | Environmental Statement Appendix 11-5 - Cumulative Effects Assessment Screening | 1 | June 2024 |
| 7.11.11.6 | REP3-012 | Environmental Statement Appendix 11-6 - Unexploded Ordnance Clearance Information and Assessment | 3 | March 2025 |
| 7.12.12.1 | APP-104 | Environmental Statement Appendix 12-1 – Offshore Ornithology Consultation Responses | 1 | June 2024 |
| 7.12.12.2 | APP-105 | Environmental Statement Appendix 12-2 - Technical Appendix | 1 | June 2024 |
| 7.12.12.3 | AS-060 | Environmental Statement Appendix 12-3a-c - Monthly Abundance (All, Sitting, Flying) | 2 | November 2024 |
| 7.12.12.4 | AS-062 | Environmental Statement Appendix 12-4a-c - Monthly Densities (All, Sitting, Flying) | 2 | November 2024 |
| 7.12.12.5 | AS-064 | Environmental Statement Appendix 12-5a-c - Seasonal Peak Abundance (All, Sitting, Flying) | 2 | November 2024 |
| 7.12.12.6 | AS-066 | Environmental Statement Appendix 12-6a-c - Seasonal Peak Density (All, Sitting, Flying) | 2 | November 2024 |
| 7.12.12.7 | AS-068 | Environmental Statement Appendix 12-7a-c - Survey Abundances (All, Sitting, Flying) | 2 | November 2024 |
| 7.12.12.8 | AS-070 | Environmental Statement Appendix 12-8a-c - Survey Densities (All, Sitting, Flying) | 2 | November 2024 |
| 7.12.12.9 | APP-112 | Environmental Statement Appendix 12-9 - Collision Risk Modelling Outputs | 1 | June 2024 |
| 7.12.12.10 | APP-113 | Environmental Statement Appendix 12-10 - Species Distribution Figures | 1 | June 2024 |
| 7.12.12.11 | APP-114 | Environmental Statement Appendix 12-11 - Review of Turbines Lighting | 1 | June 2024 |
| 7.12.12.12 | APP-115 | Environmental Statement Appendix 12-12 - Seasonal Displacement Matrices Upper Lower C.I. Abundance | 1 | June 2024 |
| 7.12.12.13 | REP6-018 | Environmental Statement Appendix 12-13 Population Viability Analyses | 3 | June 2025 |
| 7.13.13.1 | APP-119 | Environmental Statement Appendix 13-1 - Commercial Fisheries Consultation Responses | 1 | June 2024 |
| 7.13.13.2 | APP-120 | Environmental Statement Appendix 13-2 - Commercial Fisheries Technical Report | 1 | June 2024 |
| 7.14.14.1 | APP-123 | Environmental Statement Appendix 14-1 - Shipping and Navigation Consultation Responses | 1 | June 2024 |
| 7.14.14.2 | REP7-054 | Environmental Statement Appendix 14-2 - Navigational Risk Assessment | 2 | June 2025 |
| 7.15.15.1 | APP-127 | Environmental Statement Appendix 15-1 - Aviation and Radar Consultation Responses | 1 | June 2024 |
| 7.15.15.2 | REP7-058 | Environmental Statement Appendix 15-2 - Airspace Analysis and Radar Modelling | 2 | June 2025 |
| 7.15.15.3 | REP4-036 | Environmental Statement Appendix 15-3 - Helicopter Access Report | 2 | April 2025 |
| 7.16.16.1 | APP-132 | Environmental Statement Appendix 16-1 - Infrastructure and Other Users Consultation Responses | 1 | June 2024 |
| 7.17.17.1 | APP-135 | Environment Statement Appendix 17-1 - Offshore Archaeology and Cultural Heritage Consultation Responses | 1 | June 2024 |
| 7.17.17.2 | APP-136 | Environmental Statement Appendix 17-2 - Archaeological Assessment of Geophysical Data for Environmental Impact Assessment | 1 | June 2024 |
| 7.17.17.3 | APP-137 | Environmental Statement Appendix 17-3 - Palaeolandscapes Assessment of 2022 Marine Geophysical Data | 1 | June 2024 |
| 7.17.17.4 | APP-138 | Environmental Statement Appendix 17-4 – Stage 1 Geoarchaeological Review of Geotechnical Data | 1 | June 2024 |
| 7.17.17.5 | APP-139 | Environmental Statement Appendix 17-5 - Gazetteer of Recorded Losses | 1 | June 2024 |
| 7.18.18.1 | APP-142 | Environmental Statement Appendix 18-1 - Terrestrial Ecology and Ornithology Consultation Responses | 1 | June 2024 |
| 7.18.18.2 | REP7-067 | Environmental Statement Appendix 18-2 - Habitat Survey Report | 3 | June 2025 |
| 7.18.18.3 | APP-144 | Environmental Statement Appendix 18-3 - Great Crested Newt Report | 1 | June 2024 |
| 7.18.18.4 | APP-145 | Environmental Statement Appendix 18-4 - Badger Report - Confidential | 1 | June 2024 |
| 7.18.18.5 | REP7-069 | Environmental Statement Appendix 18-5 - Bats Report - Ground Level Tree Assessment | 3 | June 2025 |
| 7.18.18.6 | APP-147 | Environmental Statement Appendix 18-6 - Bats Report - Monthly Activity Transects Part 1 of 2 | 1 | June 2024 |
| 7.18.18.6 | APP-148 | Environmental Statement Appendix 18-6 - Bats Report - Monthly Activity Transects Part 2 of 2 | 1 | June 2024 |
| 7.18.18.7 | APP-149 | Environmental Statement Appendix 18-7 - Ornithology Overwintering Report Part 1 of 3 | 1 | June 2024 |
| 7.18.18.7 | APP-150 | Environmental Statement Appendix 18-7 - Ornithology Overwintering Report Part 2 of 3 | 1 | June 2024 |
| 7.18.18.7 | APP-151 | Environmental Statement Appendix 18-7 - Ornithology Overwintering Report Part 3 of 3 | 1 | June 2024 |
| 7.18.18.8 | APP-152 | Environmental Statement Appendix 18-8 - Ornithology Breeding Bird Report Part 1 of 4 | 1 | June 2024 |
| 7.18.18.8 | APP-153 | Environmental Statement Appendix 18-8 - Ornithology Breeding Bird Report Part 2 of 4 | 1 | June 2024 |
| 7.18.18.8 | APP-154 | Environmental Statement Appendix 18-8 - Ornithology Breeding Bird Report Part 3 of 4 | 1 | June 2024 |
| 17.18.18.8 | APP-155 | Environmental Statement Appendix 18-8 - Ornithology Breeding Bird Report Part 4 of 4 | 1 | June 2024 |
| 17.18.18.9 | REP2-021 | Environmental Statement Appendix 18-9 - Water Voles and Otters Report | 2 | February 2025 |
| 7.18.18.10 | REP5-015 | Environmental Statement Appendix 18-10 - Biodiversity Net Gain Strategy | 2 | May 2025 |
| 7.19.19.1 | APP-160 | Environmental Statement Appendix 19-1 - Geology and Land Quality Consultation Responses | 1 | June 2024 |
| 7.19.19.2 | REP6-023 | Environmental Statement Appendix 19-2 – Geo-Environmental Desk Study and Preliminary Risk Assessment Report | 2 | June 2025 |
| 7.19.19.3 | APP-162 | Environmental Statement Appendix 19-3 - Onshore Waste Assessment | 1 | June 2024 |
| 7.20.20.1 | APP-165 | Environmental Statement Appendix 20-1 - Flood Risk and Hydrology Consultation Responses | 1 | June 2024 |
| 7.20.20.2 | APP-166 | Environmental Statement Appendix 20-2 - Geomorphological Baseline Survey Technical Report | 1 | June 2024 |
| 7.20.20.3 | REP5-020 | Environmental Statement Appendix 20-3 - Water Environment Regulations Compliance Assessment | 4 | May 2025 |
| 7.20.20.4 | REP7-071 | Environmental Statement Appendix 20-4 - Flood Risk Assessment | 2 | June 2025 |
| 7.21.21.1 | APP-171 | Environmental Statement Appendix 21-1 - Land Use Consultation Responses | 1 | June 2024 |
| 7.22.22.1 | APP-174 | Environmental Statement Appendix 22-1 - Onshore Archaeology and Cultural Heritage Consultation Responses | 1 | June 2024 |
| 7.22.22.2 | APP-175 | Environmental Statement Appendix 22-2 - Onshore Archaeological Desk-Based Assessment | 1 | June 2024 |
| 7.22.22.3 | APP-176 | Environmental Statement Appendix 22-3 - Assessment of Airborne and Satellite Remote Sensing Data and Map Regression Analysis for Archaeology | 1 | June 2024 |
| 7.22.22.4 | APP-177 | Environmental Statement Appendix 22-4 - Heritage Walkover Survey Report | 1 | June 2024 |
| 7.22.22.5 | REP7-076 | Environmental Statement Appendix 22-5 - Onshore Infrastructure Settings Assessment | 2 | June 2025 |
| 7.22.22.6 | APP-179 | Environmental Statement Appendix 22-6 - Geoarchaeological Desk Based Assessment | 1 | June 2024 |
| 7.22.22.7 | APP-180 | Environmental Statement Appendix 22-7 - Geophysical Assessment Report Part 1 of 9 | 1 | June 2024 |
| 7.22.22.7 | APP-181 | Environmental Statement Appendix 22-7 - Geophysical Assessment Report Part 2 of 9 | 1 | June 2024 |
| 7.22.22.7 | APP-182 | Environmental Statement Appendix 22-7 - Geophysical Assessment Report Part 3 of 9 | 1 | June 2024 |
| 7.22.22.7 | APP-183 | Environmental Statement Appendix 22-7 - Geophysical Assessment Report Part 4 of 9 | 1 | June 2024 |
| 7.22.22.7 | APP-184 | Environmental Statement Appendix 22-7 - Geophysical Assessment Report Part 5 of 9 | 1 | June 2024 |
| 7.22.22.7 | APP-185 | Environmental Statement Appendix 22-7 - Geophysical Assessment Report Part 6 of 9 | 1 | June 2024 |
| 7.22.22.7 | APP-186 | Environmental Statement Appendix 22-7 - Geophysical Assessment Report Part 7 of 9 | 1 | June 2024 |
| 7.22.22.7 | APP-187 | Environmental Statement Appendix 22-7 - Geophysical Assessment Report Part 8 of 9 | 1 | June 2024 |
| 7.22.22.7 | APP-188 | Environmental Statement Appendix 22-7 - Geophysical Assessment Report Part 9 of 9 | 1 | June 2024 |
| 7.22.22.8 | APP-189 | Environmental Statement Appendix 22-8 - Interim Archaeological Evaluation Report | 1 | June 2024 |
| 7.22.22.9 | APP-190 | Environmental Statement Appendix 22-9 - Archaeological and Geoarchaeological Watching Brief and Deposit Model Report | 1 | June 2024 |
| 7.22.22.10 | APP-191 | Environmental Statement Appendix 22-10 - Additional Assessment of Airborne and Satellite Remote Sensing Data and Map Regression Analysis for Archaeology | 1 | June 2024 |
| 7.22.22.11 | REP7-078 | Environmental Statement Appendix 22- 11 Phase 1 Trenching Report (Part 1 of 4) | 1 | June 2025 |
| 7.22.22.11 | REP7-079 | Environmental Statement Appendix 22- 11 Phase 1 Trenching Report (Part 2 of 4) | 1 | June 2025 |
| 7.22.22.11 | REP7-080 | Environmental Statement Appendix 22- 11 Phase 1 Trenching Report (Part 3 of 4) | 1 | June 2025 |
| 7.22.22.11 | REP7-081 | Environmental Statement Appendix 22-11 Phase 1 Trenching Report (Part 4 of 4) | 1 | June 2025 |
| 7.22.22.12 | REP7-082 | Environmental Statement Appendix 22-12 Full Coverage Geophysical Assessment Report (Part 1 of 6) | 1 | June 2025 |
| 7.22.22.12 | REP7-083 | Environmental Statement Appendix 22-12 Full Coverage Geophysical Assessment Report (Part 2 of 6) | 1 | June 2025 |
| 7.22.22.12 | REP7-084 | Environmental Statement Appendix 22-12 Full Coverage Geophysical Assessment Report (Part 3 of 6) | 1 | June 2025 |
| 7.22.22.12 | REP7-085 | Environmental Statement Appendix 22-12 Full Coverage Geophysical Assessment Report (Part 4 of 6) | 1 | June 2025 |
| 7.22.22.12 | REP7-086 | Environmental Statement Appendix 22-12 Full Coverage Geophysical Assessment Report (Part 5 of 6) | 1 | June 2025 |
| 7.22.22.12 | REP7-087 | Environmental Statement Appendix 22-12 Full Coverage Geophysical Assessment Report (Part 6 of 6) | 1 | June 2025 |
| 7.22.22.13 | REP7-088 | Environmental Statement Appendix 22-13 Phase 2 Trenching Report (Part 1of 2) | 1 | June 2025 |
| 7.22.22.13 | REP7-089 | Environmental Statement Appendix 22-13 Phase 2 Trenching Report (Part 2 of 2) | 1 | June 2025 |
| 7.23.23.1 | APP-194 | Environmental Statement Appendix 23-1 - Landscape and Visual Impact Assessment Consultation Responses | 1 | June 2024 |
| 7.24.1 | REP7-092 | Environmental Statement Appendix 24-2 - Transport Assessment (Revision 3) Part 1 of 2 | 3 | June 2025 |
| 7.24.1 | REP7-094 | Environmental Statement Appendix 24-2 - Transport Assessment (Revision 3) Part 2 of 2 | 3 | June 2025 |
| 7.24.24.1 | APP-197 | Environmental Statement Appendix 24-1 - Traffic and Transport Consultation Responses | 1 | June 2024 |
| 7.24.24.2 | REP7-092 | Environmental Statement Appendix 24-2 - Transport Assessment Part 1 of 2 | 3 | June 2025 |
| 7.24.24.2 | REP7-094 | Environmental Statement Appendix 24-2 - Transport Assessment Part 2 of 2 | 3 | June 2025 |
| 7.24.24.3 | APP-199 | Environmental Statement Appendix 24-3 - Abnormal Indivisible Load Access Report | 1 | June 2024 |
| 7.24.24.4 | APP-200 | Environmental Statement Appendix 24-4 - Interactions Between Impacts | 1 | June 2024 |
| 7.25.25.1 | APP-203 | Environmental Statement Appendix 25-1 - Noise Consultation Responses | 1 | June 2024 |
| 7.25.25.2 | APP-204 | Environmental Statement Appendix 25-2 - Baseline Noise Monitoring | 1 | June 2024 |
| 7.25.25.3 | REP1-021 | Environmental Statement Appendix 25-3 - Construction Noise Assessment | 2 | January 2025 |
| 7.25.25.4 | APP-206 | Environmental Statement Appendix 25-4 - Construction Road Traffic Noise Assessment | 1 | June 2024 |
| 7.25.25.5 | REP6-031 | Environmental Statement Appendix 25-5 - Operational Noise Assessment | 2 | June 2025 |
| 7.26.26.1 | APP-210 | Environmental Statement Appendix 26-1 - Air Quality Consultation Responses | 1 | June 2024 |
| 7.26.26.2 | APP-211 | Environmental Statement Appendix 26-2 - Construction Dust and Fine Particulate Matter Assessment Methodology | 1 | June 2024 |
| 7.26.26.3 | APP-212 | Environmental Statement Appendix 26-3 - Air Quality Assessment Traffic Data | 1 | June 2024 |
| 7.26.26.4 | APP-213 | Environmental Statement Appendix 26-4 - Air Quality Assessment - Construction Phase Road Traffic Emissions Receptor Locations | 1 | June 2024 |
| 7.27.27.1 | APP-216 | Environmental Statement Appendix 27-1 - Human Health Consultation Responses | 1 | June 2024 |
| 7.28.28.1 | APP-218 | Environmental Statement Appendix 28-1 - Socio-economics Consultation Responses | 1 | June 2024 |
| 7.29.29.1 | APP-221 | Environmental Statement Appendix 29-1 - Tourism and Recreation Consultation Responses | 1 | June 2024 |
| 7.30.30.1 | APP-223 | Environmental Statement Appendix 30-1 - Climate Change Consultation Responses | 1 | June 2024 |
| 7.30.30.2 | REP6-038 | Environmental Statement Appendix 30-2 - Greenhouse Gas Assessment Methodology | 2 | June 2025 |
| 70.30.30.3 | APP-225 | Environmental Statement Appendix 30-3 - Climate Change Resilience Assessment Methodology | 1 | June 2024 |
| 70.30.30.4 | REP6.040 | Environmental Statement Appendix 30-4 - Additional Wake Loss Scenarios | 1 | June 2025 |