Paragraph 20 I1

(1)

Except where F1a stage of the onshore works F2(or part thereof) is are carried out in accordance with the plans referred to in Requirement 19, no stage of the onshore works may commence until details of F3the layout, scale, levels and external appearance (in so far as those details are not shown on those plans) F4for the relevant stage have been submitted to and approved by the relevant planning authority. F5Where the relevant stage includes all or any part of Work Nos. 4A, 5A, 4B or 5B, this must include a section showing cable depths for Work Nos. 4A, 5A, 4B or 5B as appropriate.

(2)

No building forming part of Work No. 7 may exceed 20 metres in height above the floor level for that location, excluding lightning protection.

F6(3)

For the avoidance of doubt (and to the extent that such works are not carried out in accordance with the plans referred to in Requirement 19 and therefore require approval)—

(a)

in relation to Work No. 7, the relevant planning authority may approve—

(i)

the detailed design for the Project A converter station works and the Project B converter station works as separate stages (or part thereof); and

(ii)

the detailed design for the Project A converter station enabling works and the Project B converter station enabling works as either separate stages (or part thereof) or as a single stage (or part thereof) comprising the Work No.7 enabling works;

(b)

in relation to Work No. 8S, the relevant planning authority may approve the detailed design for the Project A HVAC cable works and the Project B HVAC cable works as either separate stages (or part thereof) or the same stage (or part thereof);

(c)

in relation to Work No. 9, the relevant planning authority may approve the detailed design for the Project A National Grid substation connection works and the Project B National Grid substation connection works as either separate stages (or part thereof) or the same stage (or part thereof);

(d)

in relation to Work Nos. 2A, 2B, 3A, 3B, 4A, 4B, 5A, 5B, 6A, 6B, 8A, 8B and 8S the relevant planning authority may approve the detailed design of the cable preparation works as a separate stage (or part thereof); and

(4)

The details approved under paragraph (1) may cover one or more stages of the onshore works.

Annotations

Textual amendments

F1

Words in Sch. 1 Pt. 3 para. 20(1) inserted (1.12.2020) by The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020 (S.I. 2020/1389), arts. 1, 15(a)(i)

F2

Words in Sch. 1 Pt. 3 para. 20(1) inserted (1.12.2020) by The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020 (S.I. 2020/1389), arts. 1, 15(a)(ii)

F3

Words in Sch. 1 Pt. 3 para. 20(1) substituted (1.12.2020) by The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020 (S.I. 2020/1389), arts. 1, 15(a)(iii)

F4

Words in Sch. 1 Pt. 3 para. 20(1) inserted (1.12.2020) by virtue of The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020 (S.I. 2020/1389), arts. 1, 15(a)(iv)

F5

Words in Sch. 1 Pt. 3 para. 20(1) substituted (1.12.2020) by The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020 (S.I. 2020/1389), arts. 1, 15(a)(v)

F6

Sch. 1 Pt. 3 para. 20(3)(4) inserted (1.12.2020) by The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020 (S.I. 2020/1389), arts. 1, 15(b)

Commencement

I1

Sch. 1 Pt. 3 para. 20 in force at 26.8.2015, see art. 1