Paragraph 7 I1

(1)

Within Work No. 1A, the wind turbine generator foundations must not have—

(a)

a total seabed footprint exceeding 1,005,300 square metres;

(b)

subsea scour protection exceeding 1,084,850 cubic metres in total volume of material;

(c)

subsea scour protection exceeding 755,400 square metres in total seabed footprint.

(2)

Within Work No. 1B, the wind turbine generator foundations must not have—

(a)

a total seabed footprint exceeding 1,005,300 square metres;

(b)

subsea scour protection exceeding 1,084,850 cubic metres in total volume of material;

(c)

subsea scour protection exceeding 755,400 square metres in total seabed footprint.

Annotations

Commencement

I1

Sch. 1 Pt. 3 para. 7 in force at 26.8.2015, see art. 1