Paragraph 2 I1
England, Wales and Scotland
Associated development within the meaning of section 115(2) of the 2008 Act comprising—
Work No. 2A – up to 2 export cables for the transmission of HVDC electricity together with fibre-optic cables for the transmission of electronic communications laid on or beneath the seabed between Work No. 1A(b)(ii) or a combined platform referred to in Work No. 1A(b) and Work No. 3A (including cable crossings) and situated within the co-ordinates of the export cable corridor area specified in the offshore order limits and grid co-ordinates plan.
Project A onshore works
In the Borough of Redcar and Cleveland—
Work No. 3A – up to 2 export cables for the transmission of HVDC electricity together with fibre-optic cables for the transmission of electronic communications laid underground between MLWS and MHWS connecting Work No. 2A with Work No. 4A;
Work No. 4A – up to 2 export cables for the transmission of HVDC electricity together with fibre-optic cables for the transmission of electronic communications laid underground between Work No. 3A at MHWS and Work No. 5A including the construction of a haul road and construction access;
Work No. 5A – landfall transition joint bays and trenchless installation drill launch pits together with associated landfill works, construction compound and up to 2 export cables for the transmission of HVDC electricity together with fibre-optic cables for the transmission of electric communications laid underground, in ducts if necessary, connecting Work No. 4A with Work No. 6A, including the construction of a haul road and construction access;
Work No. 6A – up to 2 export cables for the transmission of HVDC electricity together with fibre-optic cables for the transmission of electronic communications laid underground, in ducts if necessary, from Work No. 5A and running in a generally westerly direction for a distance of 7 kilometres to Work No. 7, including the construction of a haul road and construction access;
Work No. 8A – up to 3 export cables for the transmission of HVAC electricity together with fibre-optic cables for the transmission of electronic communications laid underground, in ducts if necessary, from 1 of the electrical converter substations comprised in Work No. 7 and running in a westerly direction for a distance of 2 kilometres to the connection bay within the National Grid substation connection works comprised in Work No. 9, including the construction of a haul road and construction access.
Project B offshore works
Work No. 1B –
- (a)
an offshore wind turbine generating station with a gross electrical output capacity of up to F11.4 gigawatts comprising up to 200 wind turbine generators each fixed to the seabed by monopole, multi-leg or gravity base type foundations situated within the area enclosed by the points whose co-ordinates are set out in Table 1B (the “array area”);
Table 1B - Array area
Point Latitude
(decimal degrees)
Longitude
(decimal degrees)
25 55.12443 2.14572 26 55.13002 2.21780 51 54.97070 2.50189 52 54.96096 2.48529 56 54.83864 2.27783 57 54.83862 2.26336 24 55.01111 1.95454 - (b)
up to 7 offshore platforms comprising the following—
- (i)
up to 4 offshore collector platforms situated within the array area and fixed to the seabed by F2monopole, multi-leg or gravity base type foundations;
- (ii)
1 offshore converter platform situated within the array area and fixed to the seabed by F3monopole, multi-leg or gravity base type foundations;
- (iii)
up to 2 offshore accommodation or helicopter platforms situated within the array area and fixed to the seabed by F4monopole, multi-leg or gravity base type foundations,
provided that any of the platforms comprised in Work No. 1B(b)(i) to (iii) may be co-joined to create a combined platform fixed to the seabed by F5monopole, multi-leg or gravity base type foundations;
- (i)
- (c)
up to 5 meteorological stations situated within the array area either fixed to the seabed by monopole, multi-leg or gravity base type foundations or utilising a floating support structure anchored to the seabed;
- (d)
a network of cables for the transmission of electricity and electronic communications laid on or beneath the seabed (including cable crossings) between—
- (i)
any of the wind turbine generators comprised in Work No. 1B(a);
- (ii)
any of the wind turbine generators comprised in Work No. 1B(a) and any of the works comprised in Work No. 1B(c);
- (iii)
any of the works comprised in Work No. 1B(b) and any of the works comprised in Work No. 1B(c);
- (iv)
the offshore converter platform referred to in Work No. 1B(b)(ii) or a combined platform referred to in Work No. 1B(b) and the export cable route in Work No. 2B; F6...
- (v)
F7any of the wind turbine generators comprised in Work No. 1B(a) and the offshore converter platform referred to in Work No. 1B(b)(ii); and
- (i)
- (e)
up to 10 vessel moorings situated within the array area consisting of a single floating buoy secured by chain and anchor anchored to the seabed.
- (a)
Annotations
Textual amendments
- F1
Words in Sch. 1 Pt. 1 substituted (26.3.2019) by The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) Order 2019 (S.I. 2019/669), arts. 1, 4(a)
- F2
Word in Sch. 1 Pt. 1 inserted (26.3.2019) by The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) Order 2019 (S.I. 2019/669), arts. 1, 4(b)
- F3
Word in Sch. 1 Pt. 1 inserted (26.3.2019) by The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) Order 2019 (S.I. 2019/669), arts. 1, 4(c)
- F4
Word in Sch. 1 Pt. 1 inserted (26.3.2019) by The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) Order 2019 (S.I. 2019/669), arts. 1, 4(d)
- F5
Word in Sch. 1 Pt. 1 inserted (26.3.2019) by The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) Order 2019 (S.I. 2019/669), arts. 1, 4(e)
- F6
Word in Sch. 1 Pt. 1 para. 2 omitted (15.1.2021) by virtue of The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) Order 2021 (S.I. 2021/39), arts. 1, 4
- F7
Words in Sch. 1 Pt. 1 para. 2 inserted (15.1.2021) by The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) Order 2021 (S.I. 2021/39), arts. 1, 4
Commencement
- I1
Sch. 1 Pt. 1 para. 2 in force at 26.8.2015, see art. 1