Article 11 ECO4A qualifying actions: general requirements

Original text. Later amendments are not shown.

(1)

A measure meets the requirements of this article if the measure—

(a)

is an insulation measure or a heating control measure;

(b)

is installed at domestic premises;

(c)

results in the reduction in the cost of heating those premises to 21 degrees Celsius in the main living areas and 18 degrees Celsius in all other areas;

(d)

is completed on or after 30th March 2023 and before 1st April 2026;

(e)

is installed at—

(i)

premises erected before 1st April 2022; or

(ii)

premises which were first occupied as domestic premises before the day on which the installation is completed;

(f)

is not funded by a grant made by—

(i)

a public authority; or

(ii)

any person distributing funds on behalf of a public authority; and

(g)

is not a measure notified to the Administrator in accordance with article 43 of the 2022 Order.