Article 11 ECO4A qualifying actions: general requirements
A measure meets the requirements of this article if the measure—
is an insulation measure or a heating control measure;
is installed at domestic premises;
results in the reduction in the cost of heating those premises to 21 degrees Celsius in the main living areas and 18 degrees Celsius in all other areas;
is completed on or after 30th March 2023 and before 1st April 2026;
is installed at—
premises erected before 1st April 2022; or
premises which were first occupied as domestic premises before the day on which the installation is completed;
is not funded by a grant made by—
a public authority; or
any person distributing funds on behalf of a public authority; and
is not a measure notified to the Administrator in accordance with article 43 of the 2022 Order.