Article 20 Flat in-fill measures
A measure (“measure X”) is a “flat in-fill measure” and meets the condition in this article if—
it is installed at domestic premises that are in a block of flats;
it is one of the following measures—
solid wall insulation; or
cavity wall insulation;
it is linked with one other measure (“the primary measure”) which is—
the same kind of measure as measure X;
promoted by the same participant that promoted measure X; and
installed at separate domestic premises in the same block of flats as measure X; and
For the purposes of paragraph (1)(c)—
measure X is linked with a primary measure if—
measure X is completed during the three month period beginning with the day on which the primary measure is completed;
measure X is notified under article 25 on the same day as, or after, the notification of the primary measure under that article;
when notifying measure X under article 25, the participant includes information sufficient to enable the Administrator to identify the primary measure with which it is to be linked; and
the primary measure is not already linked with another in-fill measure;
a primary measure is the same kind of measure as measure X if—
both are solid wall insulation; or
both are cavity wall insulation.
In this article—
-
“block of flats” means a building which contains two or more flats;
-
“flat”—
- (a)
in respect of domestic premises in England and Wales, has the same meaning as in the Building Regulations 2010f1;
- (b)
in respect of domestic premises in Scotland, has the same meaning as in the Building (Scotland) Regulations 2004f2 and also includes a maisonette, as defined in those Regulations.
- (a)
Annotations
Footnotes
- f1
-
S.I. 2010/2214. See regulation 2(1). There are amending instruments but none are relevant.
- f2
-
S.S.I. 2004/406. See regulation 2(1). There are amending instruments but none are relevant.