Article 21 House in-fill measures

Original text. Later amendments are not shown.

(1)

A measure (“measure Y”) is a “house in-fill measure” and meets the condition in this article if—

(a)

it is installed at domestic premises—

(i)

that are not in a block of flats; and

(ii)

for which the pre-installation SAP band is band D, E, F or G;

(b)

it is solid wall insulation;

(c)

it is linked with three other measures (“the primary measures”) which are—

(i)

solid wall insulation;

(ii)

promoted by the same participant that promoted measure Y; and

(iii)

installed at three separate domestic premises on the same street as measure Y; and

(d)

the primary measures with which measure Y is linked are ECO4A qualifying actions by virtue of meeting the condition in any of articles 12 to 19.

(2)

For the purposes of paragraph (1)(c), measure Y is linked with the primary measures if—

(a)

measure Y is completed during the three month period beginning with the day on which the last of the primary measures is completed;

(b)

measure Y is notified under article 25 on the same day as, or after, the notification of the primary measures under that article;

(c)

when notifying measure Y under article 25, the participant includes information sufficient to enable the Administrator to identify the primary measures with which it is to be linked; and

(d)

none of the primary measures are already linked with another in-fill measure.

(3)

In this article, “block of flats” has the same meaning as in article 20(3).