Regulation 49 Schedule 9 (waste operations)
Schedule 9 to the principal Regulations is amended as follows.
In paragraph 3(2), in the definition of “relevant waste operation” in paragraph (a) omit “Part A mobile plant or”.
For sub-paragraph 3(3)(b) and (c) substitute—
“(b)the disposal of hazardous waste (other than by incineration or landfill) in a facility with a capacity of more than 10 tonnes per day;
(c)the recovery of hazardous waste falling within sub-paragraph (i) to (v), (viii) or (x) of paragraph (a) of Part A(1) of Section 5.3 of Part 2 of Schedule 1;
(d)the disposal of non-hazardous waste falling within paragraph (a) of Part A(1) of Section 5.4 of Part 2 of Schedule 1;
(e)the recovery or a mix of recovery and disposal of non-hazardous waste falling within paragraph (b) of Part A(1) of Section 5.4 of Part 2 of Schedule 1;
(f)temporary or underground storage of hazardous waste falling within Part A(1) of Section 5.6 of Part 2 of Schedule 1.”.
In paragraph 3(4), after paragraph (a) omit “and” and at the end insert—
“, or
(c)is an exempt waste operation”.