OpenLegislation

Regulation 21 Metering of plants in simple systems where application for accreditation of the plant is made before 24th September 2013

Original text. Later amendments are not shown.

A class 2 heat meter must be installed to measure the heat in kWhth generated by a plant where—

(a)

the plant is generating and supplying heat solely for one or more eligible purposes within one building;

(b)

no heat generated by the plant is delivered by steam;

(c)

the plant is not a CHP system; and

(d)

the application for accreditation of the plant is made before 24th September 2013.