The Renewable Heat Incentive Scheme Regulations 2017
Draft 2017, ISBN 9780111156476
Draft Regulations laid before Parliament under section 105(3) of the Energy Act 2008, for approval by resolution of each House of Parliament.
Energy
Laid before Parliament ***
Coming into force in accordance with regulation 1
The Secretary of State, in exercise of the powers conferred by sections 100 and 104(2) of the Energy Act 2008f1, makes the following Regulations.
In accordance with section 105(3) of that Act, a draft of this instrument was laid before Parliament and approved by a resolution of each House of Parliament.
In accordance with section 100(7) of that Act, the Secretary of State has obtained the consent of the Scottish Ministers to the making of these Regulations.
Annotations to the whole text
Footnotes
- f1
-
2008 c. 32; section 100 was amended by S.I. 2011/2195 and section 51 of the Infrastructure Act 2015 (c.7). Section 51 also amended section 105 of the Energy Act 2008 (Parliamentary control of subordinate legislation) and inserted subsections (3A) to (3I) concerning provisions which require the affirmative resolution procedure.
Contents
- Part 1: Introductory provisions
- 1Citation and commencement
- 2Interpretation
- 3Renewable heat incentive scheme
- Part 2: Eligibility and matters relating to eligibility
- Chapter 1: Eligible installations
- 4Eligible installations
- Chapter 2: Eligibility criteria for technologies
- 5Eligible installations generating heat from solid biomass
- 6RHI emission certificates
- 7Eligible installations generating heat from solid biomass contained in waste
- 8Eligible installations generating heat using solar collectors
- 9Eligible installations generating heat using ground source heat pumps
- 10Eligible installations generating heat using air source heat pumps
- 11Eligible installations which are shared ground loop systems
- 12Eligible installations which are CHP systems
- 13Eligible installations which are new solid biomass CHP systems
- 14Eligible installations generating heat using geothermal sources
- 15Eligible installations generating heat using biogas
- 16Other eligibility requirements for technologies
- 17Planning permission
- 18Certification for installation of microgeneration heating equipment
- 19Plants comprised of more than one plant
- 20Excluded plants
- Chapter 3: Eligibility criteria in relation to metering and steam measuring
- 21Metering of plants in simple systems where application for accreditation of the plant is made before 24th September 2013
- 22Metering of plants in complex systems where application for accreditation of the plant is made before 24th September 2013
- 23Metering in respect of applications for accreditation made on or after 24th September 2013
- 24Metering in respect of shared ground loop systems
- 25Electricity metering in respect of ground source and air source heat pumps in respect of which the application for accreditation is made on or after 28th May 2014 and shared ground loop systems
- 26Shared meters
- 27Metering of CHP systems generating electricity only before commissioning as a CHP system
- 28Matters relating to all heat meters and steam measuring equipment
- 29Additional metering requirements for plants generating heat from biogas
- Part 3: Accreditation, registration and tariff guarantees
- 30Applications for accreditation
- 31Treatment of grants from public funds
- 32Producers of biomethane
- 33Preliminary accreditation
- 34Preliminary registration of biomethane producers
- 35Tariff guarantees
- Part 4: Ongoing obligations for participants
- Chapter 1: Ongoing obligations relating to the use of solid biomass to generate heat
- 36Interpretation
- 37Participants using solid biomass contained in waste
- 38Participants using solid biomass in accredited RHI installations with an installation capacity of 1MWth or above
- 39Participants using solid biomass in accredited RHI installations with an installation capacity of between 45kWth and 1MWth
- Chapter 2: Ongoing obligations relating to the use of biogas to generate heat and the production of biomethane for injection
- 40Biogas produced from gasification or pyrolysis
- 41Participants generating heat from biogas
- 42Biomethane producers
- Chapter 3: Ongoing obligations relating to other matters
- 43Ongoing obligations: general
- 44Ongoing obligations: emissions from biomass
- 45Ongoing obligations in relation to metering
- 46Ongoing obligations in relation to the provision of information
- Part 5: Sustainable solid biomass etc
- 47Interpretation
- 48Ongoing obligation to use sustainable solid biomass or biogas or to produce sustainable biomethane
- 49Information to be provided to the Authority in relation to the use of sustainable solid biomass etc
- 50Sustainability audit reports
- 51Schemes for listing approved sustainable fuels
- Part 6: Changes affecting accredited RHI installations
- 52Review of accreditation or registration following notification of a change in circumstances
- 53Change in circumstances for shared ground loop systems
- 54Changes in ownership
- 55Changes in location of accredited RHI installations
- Part 7: Periodic support payments
- 56Interpretation
- 57Publication of tariffs
- 58Expenditure forecast statement and tariff change notice
- 59Calculation and payment of periodic support payments to participants
- 60Calculation of initial tariffs
- 61Calculation of A
- 62Calculation of subsequent tariffs
- 63Tiered tariffs
- 64Periodic support payments for accredited RHI installations in simple systems in respect of which an application for accreditation was made before 24th September 2013
- 65Periodic support payments accredited RHI installations for complex systems in respect of which an application for accreditation was made before 24th September 2013
- 66Periodic support payments for accredited RHI installations in respect of which an application for accreditation is made on or after 24th September 2013
- 67Periodic support payments for CHP systems using biomass or biogas in combination with other sources of energy
- 68Periodic support payments for new solid biomass CHP systems
- 69CHP systems accredited in relation to the Renewables Obligation
- 70Periodic support payments for shared ground loop systems
- 71Fossil fuel contamination of solid biomass and fossil fuel used for permitted ancillary purposes
- 72Fossil fuel contamination adjustment to periodic support payments for producers and combusters of biogas produced from gasification and pyrolysis
- 73Periodic support payments to producers of biomethane
- 74Reconciliation payments for biogas and biomethane produced by anaerobic digestion on or after the date on which these regulations come into force
- 75Calculation of heat loss in certain circumstances
- Part 8: Additional RHI capacity
- 76Additional RHI capacity
- 77Additional capacity for biomethane production
- Part 9: Enforcement
- 78Power to temporarily withhold periodic support payments to investigate alleged non-compliance
- 79Power to withhold periodic support payments: further provisions
- 80Power to permanently withhold or reduce a participant’s periodic support payments
- 81Revocation of accreditation or registration
- 82Power to correct the level of tariff being paid to a participant
- 83Overpayment notices and offsetting
- 84Revocation of sanctions
- 85Power to inspect accredited RHI installations and equipment used to produce biomethane
- Part 10: Administrative functions of the Authority
- 86Right of review
- 87Publication of guidance and tariffs
- 88Provision of information to the Authority etc
- 89Reporting obligations
- 90Additional information
- 91Notices
- Part 11: Revocation and savings
- 92Revocation, savings and transitional provisions
- Signature
- Schedule 1: Content of RHI emission certificates
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- 4Paragraph 4
- 5Paragraph 5
- 6Paragraph 6
- 7Paragraph 7
- 8Paragraph 8
- 9Paragraph 9
- 10Paragraph 10
- 11Paragraph 11
- 12Paragraph 12
- 13Paragraph 13
- 14Paragraph 14
- 15Paragraph 15
- 16Paragraph 16
- Schedule 2: Information required for accreditation or registration
- 1Paragraph 1
- Schedule 3: Greenhouse gas criteria
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- 4Paragraph 4
- Schedule 4: Land criteria
- Part 1: Interpretation
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- Part 2: Land criteria for solid biomass which is wood or wholly derived from wood, excluding energy crops
- 4Paragraph 4
- 5Paragraph 5
- 6Paragraph 6
- 7Paragraph 7
- Part 3: Land criteria for other solid biomass including energy crops
- 8Paragraph 8
- 9Paragraph 9
- 10Paragraph 10
- 11Paragraph 11
- 12Paragraph 12
- Schedule 5: Information to be provided to the Authority where biomass is used for combustion or production of biomethane
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- Schedule 6Tariffs
- Schedule 7: Degression
- 1Calculation of B
- 2Calculation of C
- Explanatory note