Article 10 Calculation C
(1)
The figure representing the sum of the estimates in Articles 6 and 7, multiplied by 0.2, is calculation C for that obligation period.
(2)
Where calculation C is not a whole number, it is to be rounded to the nearest whole number (one-half being rounded upwards).
(3)
References to calculation C in Articles 11 and 12 shall be construed accordingly.