OpenLegislation

Part 3 DESIGN PARAMETERS ASSOCIATED WITH THE COMMON INFRASTRUCTURE REQUIRED FOR BOTH THE CARBON CAPTURE PLANT FOR UNIT 1 AND THE CARBON CAPTURE PLANT FOR UNIT 2

Original text. Later amendments are not shown.

(1)

Component / Building / Area

(2)

Work No.

(3)

Maximum number

(4)

Maximum length (m)

(5)

Maximum width (m)

(6)

Maximum height (m AGL)

(7)

Maximum height (m AOD)

(1)

Buildings / Structures may be coupled together. Total building volume will however not exceed volume required for maximum number of buildings. Maximum height stated is for all configurations. Switchrooms may also be double stacked.

Carbon Capture Wastewater Treatment Plant Area1D(viii)(a)180704046.1
Solvent Storage and Make-up System Compound1D(vii)455452531.1
Combined Power Turbine Buildingf11C(iii)(bb)250453541.1
Pressure Reducing De-Superheating Station Building 1C(iii)(dd)215451521.1
Steam Pipe Bridge Connection (Connection with existing Drax Power Station Infrastructure)1C(iii)(ee)130106571.1
Steam Pipe Bridge1C(iii)(ee)1300202531.1
Fire Water Tanks1D(viii)(dd)415151521.1
Switchroom Building1F3030162026.1
Carbon Dioxide Pipe Bridge21500202026.1
Carbon Dioxide Delivery Terminal Compound (onshore carbon pipeline operator)211001001218.1

Annotations

Footnotes

f1

(1)

Buildings / Structures may be coupled together. Total building volume will however not exceed volume required for maximum number of buildings. Maximum height stated is for all configurations. Switchrooms may also be double stacked.