The Drax Power Station Bioenergy with Carbon Capture and Storage Extension Order 2024
S.I. 2024/70 · Made 16 January 2024
Infrastructure Planning
Made 16th January 2024
Coming into force 7th February 2024
The application has been examined by the Examining Authority appointed by the Secretary of State pursuant to chapter 2 of Part 6 of the 2008 Act and carried out in accordance with chapter 4 of Part 6 of that Act and with the Infrastructure Planning (Examination Procedure) Rules 2010f3.
The Examining Authority, having considered the application together with the documents that accompanied it, and the representations made and not withdrawn, has, in accordance with section 74(2)f4 of the 2008 Act made a report and recommendation to the Secretary of State.
The Secretary of State has considered the report and recommendation of the Examining Authority, has taken into account the environmental information in accordance with regulation 4 of the Infrastructure Planning (Environmental Impact Assessment) Regulations 2017f5 and has had regard to the documents and matters referred to in section 104(2) of the 2008 Act.
The Secretary of State, having decided the application, has determined to make an Order giving effect to the proposals comprised in the application on the terms that in the opinion of the Secretary of State are not materially different from those proposed in the application.
The Secretary of State, in exercise of the powers conferred by sections 114f6, 115f7, 120f8, 122 and 123 of the 2008 Act, makes the following Order—
Annotations to the whole text
Footnotes
- f1
-
2008 c. 29. Section 37 was amended by section 137(5) of, and paragraph 5 of Schedule 13 to, the Localism Act 2011 (c. 20).
- f2
- f3
-
S.I. 2010/103, amended by S.I. 2012/635.
- f4
-
Section 74 was amended by sections 128(2) and 237 and by Schedule 13, paragraph 29 and Schedule 25, paragraph 1, to the Localism Act 2011 (c. 20).
- f5
-
S.I. 2017/572, amended by S.I. 2018/695, S.I. 2018/834 and S.I. 2018/942.
- f6
-
Section 114 was amended by paragraph 55 of Part 1 of Schedule 13 to the Localism Act 2011(c. 20).
- f7
-
Section 115 was amended by section 160 of the Housing and Planning Act 2016 (c. 22) and section 43 of the Wales Act 2017 (c. 4).
- f8
-
Section 120 was amended by section 140 and paragraph 60 of Part 1 of Schedule 13 to the Localism Act 2011 (c. 20).
Contents
- Part 1: PRELIMINARY
- 1Citation and commencement
- 2Interpretation
- Part 2: PRINCIPAL POWERS
- 3Development consent etc. granted by this Order
- 4Maintenance of authorised development
- 5Operation of authorised development
- 6Benefit of the Order
- 7Consent to transfer benefit of the Order
- 8Application and modification of statutory provisions
- Part 3: STREETS
- 9Street Works
- 10Power to alter layout, etc., of streets
- 11Construction and maintenance of altered streets
- 12Temporary closure of public rights of way
- 13Access to works
- 14Agreements with street authorities
- Part 4: SUPPLEMENTAL POWERS
- 15Discharge of water
- 16Authority to survey and investigate the land
- Part 5: POWERS OF ACQUISITION
- 17Power to override easements and other rights
- 18Time limit for exercise of authority to acquire rights compulsorily
- 19Compulsory acquisition of rights
- 20Private Rights
- 21Application of the 1981 Act
- 22Acquisition of subsoil only
- 23Modification of Part 1 of the Compulsory Purchase Act 1965
- 24Rights under or over streets
- 25Temporary use of land for constructing the authorised development
- 26Temporary use of land for maintaining the authorised development
- 27Statutory undertakers
- 28Apparatus and rights of statutory undertakers in affected streets
- 29Recovery of costs of new connections
- 30Compulsory acquisition of land – incorporation of the mineral code
- Part 6: OPERATIONS
- 31Felling or lopping of trees and removal of hedgerows
- 32Protective works to buildings
- Part 7: MISCELLANEOUS AND GENERAL
- 33Protective provisions
- 34Application of landlord and tenant law
- 35Operational land for purposes of the 1990 Act
- 36Defence to proceedings in respect of statutory nuisance
- 37Certification of plans and documents, etc.
- 38Service of notices
- 39Procedure in relation to certain approvals etc
- 40Arbitration
- 41Guarantees in respect of payment of compensation
- 42Electronic communications
- 43Crown rights
- Signature
- Schedule 1AUTHORISED DEVELOPMENT
- Schedule 2: REQUIREMENTS
- 1Commencement of the authorised development
- 2Phasing of the authorised development
- 3Notice of date of full commissioning
- 4Requirement for written approval
- 5Approved details and amendments to them
- 6Detailed design approval
- 7Provision of landscape and biodiversity mitigation and enhancement
- 8External lighting during operation
- 9Highway accesses during construction
- 10Surface water drainage
- 11Flood risk mitigation
- 12Ground conditions
- 13Archaeology
- 14Construction environmental management plan
- 15Construction traffic management plan
- 16Construction worker travel plan
- 17Control of noise during operation
- 18Decommissioning environmental management plan
- 19Decommissioning traffic management plan
- 20Local liaison committee
- 21Local employment plan
- Schedule 3: LEGISLATION TO BE DISAPPLIED
- 1Paragraph 1
- Schedule 4STREETS SUBJECT TO STREET WORKS
- Schedule 5: ALTERATION OF STREETS
- 1TEMPORARY ALTERATION OF LAYOUT
- 2PERMANENT ALTERATION OF LAYOUT
- Schedule 6PUBLIC RIGHTS OF WAY TO BE TEMPORARILY CLOSED
- Schedule 7: ACCESS TO WORKS
- 1TEMPORARY MEANS OF ACCESS TO WORKS
- 2PERMANENT MEANS OF ACCESS TO WORKS
- Schedule 8: LAND IN WHICH ONLY NEW RIGHTS ETC. MAY BE ACQUIRED OR IN WHICH RIGHTS MAY BE EXTINGUISHED
- Part 1: LAND IN WHICH ONLY NEW RIGHTS ETC. MAY BE ACQUIRED
- 1Interpretation
- 2LAND IN WHICH RIGHTS MAY BE EXTINGUISHED
- Schedule 9: MODIFICATION OF COMPENSATION AND COMPULSORY PURCHASE ENACTMENTS FOR CREATION OF NEW RIGHTS AND IMPOSITION OF NEW RESTRICTIVE COVENANTS
- 1Compensation enactments
- 2Compensation enactments
- 3Compensation enactments
- 4Application of Part 1 of the 1965 Act
- 5Application of Part 1 of the 1965 Act
- Schedule 10LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN
- Schedule 11: PROCEDURE FOR DISCHARGE OF REQUIREMENTS
- 1Interpretation
- 2Applications made under requirement
- 3Further information and consultation
- 4Fees
- 5Appeals
- Schedule 12: PROTECTIVE PROVISIONS
- Part 1: FOR THE PROTECTION OF ELECTRICITY, GAS, WATER AND SEWERAGE UNDERTAKERS
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- 4Paragraph 4
- 5Paragraph 5
- 6Paragraph 6
- 7Paragraph 7
- 8Paragraph 8
- 9Paragraph 9
- 10Paragraph 10
- 11Paragraph 11
- 12Paragraph 12
- Part 2: FOR THE PROTECTION OF OPERATORS OF ELECTRONIC COMMUNICATIONS CODE NETWORKS
- 13Paragraph 13
- 14Paragraph 14
- 15Paragraph 15
- 16Paragraph 16
- 17Paragraph 17
- 18Paragraph 18
- Part 3: FOR THE PROTECTION OF NATIONAL GRID ELECTRICITY TRANSMISSION PLC AS ELECTRICITY UNDERTAKER
- 19Application
- 20Interpretation
- 21On Street Apparatus
- 22Apparatus of National Grid in affected streets
- 23Protective works to buildings
- 24Acquisition of land
- 25Removal of apparatus
- 26Facilities and rights for alternative apparatus
- 27Retained apparatus: protection
- 28Expenses
- 29Indemnity
- 30Enactments and agreements
- 31Co-operation
- 32Access
- 33Arbitration
- 34Notices
- Part 4: FOR THE PROTECTION OF NATIONAL HIGHWAYS LIMITED
- 35Application etc.
- 36Interpretation
- 37General
- 38General
- 39General
- 40Works outside the Order limits
- 41Prior approvals and security
- 42Construction of the specified works
- 43Payments
- 44Provisional Certificate
- 45Opening
- 46Final condition survey
- 47Defects Period
- 48Final Certificate
- 49Security
- 50Commuted sums
- 51Insurance
- 52Indemnity
- 53Maintenance of the specified works
- 54Land
- 55Expert Determination
- Schedule 13DOCUMENTS AND PLANS TO BE CERTIFIED
- Schedule 14: DESIGN PARAMETERS
- 1DESIGN PARAMETERS ASSOCIATED WITH THE CARBON CAPTURE PLANT FOR UNIT 1
- 2DESIGN PARAMETERS ASSOCIATED WITH THE CARBON CAPTURE PLANT FOR UNIT 2
- 3DESIGN PARAMETERS ASSOCIATED WITH THE COMMON INFRASTRUCTURE REQUIRED FOR BOTH THE CARBON CAPTURE PLANT FOR UNIT 1 AND THE CARBON CAPTURE PLANT FOR UNIT 2
- Explanatory note