Part 2 DESIGN PARAMETERS ASSOCIATED WITH THE CARBON CAPTURE PLANT FOR UNIT 2

Original text. Later amendments are not shown.

(1)

Component / Building / Area

(2)

Work No.

(3)

Maximum number

(4)

Maximum length (m)

(5)

Maximum width (m)

(6)

Maximum height (m AGL)

(7)

Maximum height (m AOD)

(1)

Component to be located at elevation (i.e. located within the duct). Height stated is the maximum height component could be AGL.

(2)

Building / Structures may be coupled together. Total building volume will however not exceed volume required for maximum number of buildings. Maximum height stated is for all configurations. Switchrooms may also be double stacked.

(3)

The Rich Solvent / Lean Solvent Heat Exchangers would be located at elevation on the Main Process and Service Rack.

Gas / Gas Heat Exchangerf11D(vi)(aa)225254551.1
Quench Column1D(ii)(aa)150304046.1
Absorber Column1D(ii)(bb)1503095101.1
Regenerator1D(iv)(aa)215157076.1
Carbon Dioxide Gas Compressor Building1E(ii)445403036.1
Carbon Dioxide Main Vent Stacks1E(iv)110103036.1
Main Process & Service Rackf2f31D(iv)1150202531.1

Annotations

Footnotes

f1

(1)

Component to be located at elevation (i.e. located within the duct). Height stated is the maximum height component could be AGL.

f2

(2)

Building / Structures may be coupled together. Total building volume will however not exceed volume required for maximum number of buildings. Maximum height stated is for all configurations. Switchrooms may also be double stacked.

f3

(3)

The Rich Solvent / Lean Solvent Heat Exchangers would be located at elevation on the Main Process and Service Rack.