Paragraph 2 Details of licensed marine activitiesI1
England, Wales and Scotland
Subject to the licence conditions, this licence authorises the undertaker (and any agent or contractor acting on their behalf) to carry out the following licensable marine activities under section 66(1) of the 2009 Act—
the deposit at sea of the substances and articles specified in paragraph 4 below;
the construction of works in or over the sea and/or on or under the sea bed;
the removal of sediment samples for the purposes of informing environmental monitoring under this licence during pre-construction, construction and operation; and
the disposal of up to 1,646,317 m3 of inert material of natural origin within the offshore Order limits produced during construction drilling or seabed preparation for foundation works and cable sandwave preparation works at disposal site reference HU212 within the extent of the Order limits seaward of MHWS, comprising—
47,342 m3 for cable installation;
1,505,000 m3 for the wind turbine generators;
73,225 m3 for the accommodation platform (which may alternatively be disposed under licence 2 (generation)); and
20,750 m3 for the meteorological masts (10,375 m3 or all of which may alternatively be disposed under licence 2 (generation)).
Annotations
Commencement
- I1
Sch. 10 Pt. 1 para. 2 in force at 29.8.2017, see art. 1