Article 2 InterpretationI1

England and Wales

(1)

In this Order—

  • “the 1961 Act” means the Land Compensation Act 1961f1;

  • “the 1965 Act” means the Compulsory Purchase Act 1965f2;

  • “the 1980 Act” means the Highways Act 1980f3;

  • “the 1981 Act” means the Compulsory Purchase (Vesting Declarations) Act 1981f4;

  • “the 1984 Act” means the Road Traffic Regulation Act 1984f5;

  • “the 1989 Act” means the Electricity Act 1989f6;

  • “the 1990 Act” means the Town and Country Planning Act 1990f7;

  • “the 1991 Act” means the New Roads and Street Works Act 1991f8;

  • “the 2008 Act” means the Planning Act 2008f9;

  • “address” includes any number or address used for the purposes of electronic transmission;

  • “apparatus” has the same meaning as in Part 3 (street works in England and Wales) of the 1991 Act except that, unless otherwise provided, it further includes pipelines (and parts of them), aerial markers, cathodic protection test posts, field boundary markers, transformer rectifier kiosks, electricity cables, telecommunications equipment and electricity cabinets;

  • “authorised development” means the development described in Schedule 1 (authorised development) and any other development within the meaning of section 32 (meaning of “development”) of the 2008 Act authorised by this Order;

  • “book of reference” means the document of that name identified in the table at Schedule 12 (documents and plans to be certified) and which is certified by the Secretary of State as the book of reference for the purposes of this Order;

  • “building” includes any structure or erection or any part of a building, structure or erection;

  • “carriageway” has the same meaning as in the 1980 Act;

  • “commence” means beginning to carry out a material operation, as defined in section 155 of the 2008 Act (when development begins), comprised in or carried out or for the purposes of the authorised development other than the permitted preliminary works (except where stated to the contrary) and “commencement”, “commenced” and cognate expressions are to be construed accordingly;

  • “Crown land plans” means the plans of that name identified in the table at Schedule 12 and which are certified by the Secretary of State as the special category land plan for the purposes of this Order;

  • “date of final commissioning” means the date on which the authorised development commences operation by generating electricity on a commercial basis but excluding the generation of electricity during commissioning and testing;

  • “electronic transmission” means a communication transmitted—

    1. (a)

      by means of an electronic communications network; or

    2. (b)

      by other means but while in electronic form;

  • “Eclipse” means Eclipse Power Networks Limited (company number 09633506) whose registered office is at 25 Osier Way, Olney, England, MK46 5FP or any successor as a licence holder within the meaning of Part 1 of the 1989 Act;

  • “environmental statement” means the document of that name identified in the table at Schedule 12 and which is certified by the Secretary of State as the environmental statement for the purposes of this Order;

  • “footpath” and “footway” have the same meaning as in the 1980 Act;

  • “framework construction environmental management plan” means the document of that name identified in the table at Schedule 12 and which is certified by the Secretary of State as the framework construction environmental management plan for the purposes of this Order;

  • “framework construction traffic management plan” means the document of that name identified in the table at Schedule 12 and which is certified by the Secretary of State as the framework construction traffic management plan for the purposes of this Order;

  • “framework decommissioning environmental management plan” means the document of that name identified in the table at Schedule 12 and which is certified by the Secretary of State as the framework decommissioning environmental management plan for the purposes of this Order;

  • “framework landscape and ecological management plan” means the document of that name identified in the table at Schedule 12 and which is certified by the Secretary of State as the framework landscape and ecological management plan for the purposes of this Order;

  • “framework operational environmental management plan” means the document of that name identified in the table at Schedule 12 and which is certified by the Secretary of State as the framework operational environmental management plan for the purposes of this Order;

  • “framework public rights of way management plan” means the document of that name identified in the table at Schedule 12 and which is certified by the Secretary of State as the framework public rights of way management plan for the purposes of this Order;

  • “framework skills, supply chain and employment plan” means the plan of that name identified in the table at Schedule 12 and which is certified by the Secretary of State as the framework skills, supply chain and employment plan for the purposes of this Order;

  • “framework soil management plan” means the document of that name identified in the table at Schedule 12 and which is certified by the Secretary of State as the framework soil management plan for the purposes of this Order;

  • “framework surface water drainage strategy” means the document of that name identified in the table at Schedule 12 and which is certified by the Secretary of State as the framework surface water drainage strategy for the purposes of this Order;

  • “highway” and “highway authority” have the same meaning as in the 1980 Actf10;

  • “holding company” has the same meaning as in section 1159 of the Companies Act 2006f11;

  • “land plans” means the plans of that name identified in the table at Schedule 12 and which are certified by the Secretary of State as the land plans for the purposes of this Order;

  • “maintain” includes inspect, repair, adjust, alter, remove, refurbish, reconstruct, replace and improve any part of, but not remove, reconstruct or replace the whole of, the authorised development and “maintenance” and “maintaining” are to be construed accordingly;

  • “National Grid” means National Grid Electricity Transmission plc (company number 2366977) whose registered office is at 1-3 Strand, London, WC2N 5EH or any successor as a licence holder within the meaning of Part 1 of the Electricity Act 1989;

  • “Order land” means the land which is required for, or is required to facilitate, or is incidental to, or is affected by the authorised development shown coloured pink, blue, yellow or green on the land plans and described in the book of reference;

  • “Order limits” means the limits shown on the works plans within which the authorised development may be carried out and land acquired or used;

  • “outline design principles statement” means the document of that name identified in the table of Schedule 12 and which is certified by the Secretary of State as the outline design principles for the purposes of this Order;

  • “overarching written scheme of investigation” means the document of that name identified in the table at Schedule 12 and which is certified by the Secretary of State as the overarching written scheme of investigation for the purposes of this Order;

  • “owner”, in relation to land, has the same meaning as in section 7 (interpretation) of the Acquisition of Land Act 1981f12;

  • “permitted preliminary works” means all or any of—

    1. (a)

      environmental surveys, geotechnical surveys, intrusive archaeological surveys and other investigations for the purpose of assessing ground conditions;

    2. (b)

      removal of plant and machinery;

    3. (c)

      above ground site preparation for temporary facilities for the use of contractors;

    4. (d)

      remedial work in respect of any contamination or other adverse ground conditions;

    5. (e)

      diversion and laying of apparatus;

    6. (f)

      the provision of temporary means of enclosure and site security for construction;

    7. (g)

      the temporary display of site notices or advertisements;

    8. (h)

      site clearance (including vegetation removal, demolition of existing buildings and structures); or

    9. (i)

      advanced planting to allow for an early establishment of protective screening;

  • “plot” means any plot as may be identified by reference to a number and which is listed in the book of reference and shown on the land plans;

  • “relevant planning authority” means the local planning authority for the area in which the land to which the provisions of this Order apply is situated and as more particularly described for the purposes of the requirements in Schedule 2 (requirements);

  • “requirements” means those matters set out in Schedule 2 and “requirement” means any one of the requirements and any reference to a numbered requirement is to be construed accordingly;

  • “statutory undertaker” means any person falling within section 127(8) (statutory undertakers’ land) of the 2008 Act and includes a public communications provider defined by section 151(1) (interpretation of chapter 1) of the Communications Act 2003f13;

  • “street” means a street within the meaning of section 48 (streets, street works and undertakers) of the 1991 Act, together with land on the verge of a street or between two carriageways, and includes any footpath and part of a street;

  • “street authority”, in relation to a street, has the same meaning as in Part 3 of the 1991 Actf14;

  • “streets, access and rights of way plans” means the plans of that name identified in the table at Schedule 12 and which are certified by the Secretary of State as the streets, access and rights of way plans for the purposes of this Order;

  • “street works” means the works listed in article 8(1) (street works);

  • “subsidiary” has the same meaning as in section 1159 of the Companies Act 2006f15;

  • “traffic authority” has the same meaning as in section 121A (traffic authorities) of the 1984 Actf16;

  • “traffic regulation measures plan” means the document of that name identified in the table at Schedule 12 and which is certified by the Secretary of State as the traffic regulation measures plan for the purposes of this Order;

  • “undertaker” means East Yorkshire Solar Farm Limited (company number 14103404) and any other person who for the time being has the benefit of this Order in accordance with article 34 (benefit of the Order) or article 35 (consent to transfer the benefit of the Order);

  • “Upper Tribunal” means the Lands Chamber of the Upper Tribunal;

  • “watercourse” includes every river, stream, creek, ditch, drain, canal, cut, culvert, dyke, sluice, sewer and passage through which water flows except a public sewer or drain;

  • “working day” means any day apart from Saturday, Sunday or any statutory bank or public holiday; and

  • “works plans” means the plans of that name identified in the table at Schedule 12 and which are certified by the Secretary of State as the works plans for the purposes of this Order.

(2)

References in this Order to rights over land include references to rights to do or restrain or to place and maintain anything in, on or under land or in the airspace above its surface and to any trusts or incidents (including restrictive covenants) to which the land is subject and references in this Order to the imposition of restrictive covenants are references to the creation of rights over land which interfere with the interests or rights of another and are for the benefit of land which is acquired under this Order or over which rights are created and acquired under this Order or is otherwise comprised in this Order.

(3)

In this Order, references to the purposes of the authorised development includes the construction, maintenance, operation, use and decommissioning of the authorised development.

(4)

All distances, directions, capacities and lengths referred to in this Order are approximate and distances between lines or points on a numbered work comprised in the authorised development and shown on the works plans and streets, access and rights of way plans are to be taken to be measured along that work.

(5)

References in this Order to numbered works are references to the works comprising the authorised development as numbered in Schedule 1 (authorised development) and shown on the works plans and a reference in this Order to a work designated by a number, or by a combination of letters and numbers, is a reference to the work so designated in that Schedule and a reference to “Work No. [X]” or “numbered work [X]” means numbered works [X]A and [X]B inclusive and the same principle applies to such numbered works that contain letters.

(6)

In this Order, the expression “includes” is to be construed without limitation.

(7)

In this Order, references to any statutory body include that body’s successor bodies.

(8)

In this Order, all references to the singular is a reference to the plural, and vice versa, except where explicitly stated.

(9)

All areas described in square metres in the book of reference are approximate.

Annotations

Commencement

I1

Art. 2 in force at 31.5.2025, see art. 1

Footnotes

f1

1961 c. 33.

f2

1965 c. 56.

f3

1980 c. 66.

f4

1981 c. 66.

f5

1984 c. 27.

f6

1989 c. 29.

f7

1990 c. 8.

f8

1991 c. 22.

f9

2008 c. 29.

f10

“highway” is defined in section 328(1). For “highway authority” see section 1.

f11

2006 c. 46.

f12

1981 c. 67.

f13

2003 c. 21.

f14

“street authority” is defined in section 49 which was amended by paragraph 117 of Schedule 1 to the Infrastructure Act 2015 (c. 7).

f15

2006 c. 46.

f16

Section 121A was inserted by paragraph 70 of Schedule 8 to the 1991 Act, and subsequently amended by section 271 of the Greater London Authority Act 1999 (c. 29); section 1(6) of, and paragraphs 70 and 95 of Schedule 1 to the Infrastructure Act 2015; and S.I. 1999/1920 and S.I 2001/1400.