Regulation 2 CommencementI1
England, Wales and Scotland
The following come into force on 10th April 2026—
regulations 1 to 10;
regulation 15;
regulation 17;
regulation 18(1) and (3);
regulation 19(a);
Schedules 1 to 6;
Schedule 14.
The following come into force on 19th September 2026—
regulation 11(1)(a) and (b), (2) and (3);
regulations 13 and 14;
regulation 16(1) to (1B), (1E), (2)(a) and (b), and (3) to (5);
regulation 18(4);
Schedules 7 to 13;
Schedules 15 to 17.
The following come into force on 19th January 2027—
regulation 11(1)(c) to (i);
regulation 12;
regulation 16(1C) to (1D) and (2)(c) to (i);
regulation 18(2);
regulation 19(b).
Annotations
Textual amendments
- F1
Reg. 2(2) substituted (27.7.2026) by The Ecodesign for Energy-Related Products and Energy Information (Amendment) Regulations 2026 (S.I. 2026/750), regs. 1(2), 6(a)
- F2
Reg. 2(3) substituted (27.7.2026) by The Ecodesign for Energy-Related Products and Energy Information (Amendment) Regulations 2026 (S.I. 2026/750), regs. 1(2), 6(b)
Commencement
- I1
Reg. 2 in force at 10.4.2026, see reg. 2(1)(a)