Work No. 6 – gas supply pipeline connection works for the transport of natural gas to Work No. 1, comprising an underground high pressure steel pipeline of up to 1,000 millimetres (nominal bore) in diameter and approximately 4.6 kilometres in length, including cathodic protection posts, marker posts and underground electrical supply cables, transformers and control systems cables running from within the Eggborough Power Station site, north under the River Aire to a connection point with the National Transmission System for gas No. 29 Feeder pipeline west of Burn Village.