Article 4 Conditions on exemption
The exemption granted by article 3 to Gunfleet is subject to compliance with the following conditions—
(a)
that Gunfleet does not hold a licence under section 6(1)(a) of the Act (licence authorising generation of electricity for supply)f1;
(b)
that Gunfleet Sands Wind Farm is connected to the total system in England and Wales and (except in circumstances outside the reasonable control of Gunfleet) does not export more than 100 megawatts of electrical power to it at any time.
Annotations
Footnotes
- f1
-
Section 6 was substituted by section 30 of the Utilities Act 2000.