Section 10H Designation for the purposes of the Electricity RegulationF1F6
This section applies in relation to any period for which a person—
holds a transmission licence or an interconnector licence; and
is certified.
If the person is certified on the first, second, fourth or fifth certification ground in section 10E, the person is designated as an electricity transmission system operator for the purposes of F2the Electricity Regulation.
If the person is certified on the third certification ground in section 10E, the independent system operator nominated in the application for certification is designated as an electricity transmission system operator for the purposes of F3the Electricity Regulation.
Annotations
Textual amendments
- F1
Ss. 10A-10O and cross-heading inserted (10.11.2011) by The Electricity and Gas (Internal Markets) Regulations 2011 (S.I. 2011/2704), regs. 1(1), 5
- F2
Words in s. 10H(2) substituted (31.12.2020) by The Electricity and Gas etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/530), regs. 1(1), 48(3) (with reg. 48(6)(7)) (as amended by S.I. 2020/1016, regs. 1(2), 3(19)); 2020 c. 1, Sch. 5 para. 1(1)
- F3
Words in s. 10H(3) substituted (31.12.2020) by The Electricity and Gas etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/530), regs. 1(1), 48(4) (with reg. 48(6)(7)) (as amended by S.I. 2020/1016, regs. 1(2), 3(19)); 2020 c. 1, Sch. 5 para. 1(1)
- F4
Word in s. 10H(4) inserted (31.12.2020) by The Electricity and Gas etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/530), regs. 1(1), 48(5)(a) (with reg. 48(6)(7)) (as amended by S.I. 2020/1016, regs. 1(2), 3(19)); 2020 c. 1, Sch. 5 para. 1(1)
- F5
S. 10H(4)(c) and word omitted (31.12.2020) by virtue of The Electricity and Gas etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/530), regs. 1(1), 48(5)(b) (with reg. 48(6)(7)) (as amended by S.I. 2020/1016, regs. 1(2), 3(19)); 2020 c. 1, Sch. 5 para. 1(1)
- F6
Words in s. 10H heading substituted (31.12.2020) by The Electricity and Gas etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/530), regs. 1(1), 48(2) (with reg. 48(6)(7)) (as amended by S.I. 2020/1016, regs. 1(2), 3(19)); 2020 c. 1, Sch. 5 para. 1(1)
Notes on Part I
Modifications
- C1
Pt. I modified (5.10.2004) by Energy Act 2004 (c. 20), ss. 184(12), 185(13), 198(2); S.I. 2004/2575, art. 2(1), Sch. 1
- C2
Pt. I modified (S.) (30.11.2005) by The Electricity from Non-Fossil Fuel Sources (Scotland) Saving Arrangements Order 2005 (S.S.I. 2005/549), arts. 1(1), 9
- C3
Pt. 1 excluded (30.12.2015) by The Port Talbot Steelworks Generating Station Order 2015 (S.I. 2015/1984), arts. 1, 7(2) (with art. 26)
- C4
Pt. I (ss. 1-64) applied (1.10.2001) by S.I. 2001/3264, regs. 4(2), 5(2)
- C5
Pt. I (ss. 1-64) amended (E.W.) (27.10.2000) by S.I. 2000/2727, art. 10
Pt. I (ss. 1-64) amended (7.11.2000) by 2000 c. 27, s. 105(1)(a); S.I. 2000/2974, art. 2, Sch. (subject to transitional provisions in arts. 3-12)
Pt. I (ss. 1-64) amended (E.W.) (1.10.2001) by S.I. 2000/2727, art. 10 (as substituted (1.10.2001) by S.I. 2001/3268, art. 2(13))