Article 13 Smart Energy CodeI1
England, Wales and Scotland
For a decision relating to the Smart Energy Code, the specified condition is that the decision accords with—
a recommendation by the relevant body in respect of a Path 1 Modification or a Path 2 Modification; or
a decision by the Panel in respect of a Path 3 Modification.
In paragraph (1)(a), “relevant body” means—
the Change Board where, in accordance with section D8.1 of the Smart Energy Code, the Change Board has been established; or
the Panel where, in accordance with section X2.3(d) of the Smart Energy Code, the Change Board has not been established and the Panel is performing the functions of the Change Board.
In this article, the words “Panel”, “Path 1 Modification”, “Path 2 Modification”, “Path 3 Modification” and “Change Board” have the same meaning as in section A1 of the Smart Energy Code.
Annotations
Commencement
- I1
Art. 13 in force at 18.6.2014, see art. 1(1)