OpenLegislation

Article 16 Measures installed at band E, F or G social housingI1

England, Wales and Scotland

A measure meets the condition in this article if—

(a)

the measure is installed as part of an ECO4 project at social housing for which the pre-project SAP band is band E, F or G; and

(b)

the measure is—

(i)

an insulation measure;

(ii)

a renewable heating system, except where it replaces a renewable heating system of the same kind at the domestic premises;

(iii)

a first time heating system;

(iv)

a district heating connection; or

(v)

an innovation measure.

Annotations

Commencement

I1

Art. 16 in force at 27.7.2022, see art. 1(1)