Article 78 Score for surplus action and ECO3 interim delivery actionsI1
England, Wales and Scotland
This article applies for the purpose of calculating the score to be given to a qualifying action which is—
a surplus action; or
an ECO3 interim delivery action.
Where this article applies, the score is equal to the annual cost savings of the qualifying action which are calculated in accordance with the following formulaf1—
E x £0.31 / £17.83.
In paragraph (2), “E” is the ECO3 cost savings for the qualifying action.
Annotations
Commencement
- I1
Art. 78 in force at 27.7.2022, see art. 1(1)
Footnotes
- f1
-
£0.31 is the cost that the Department for Business, Energy and Industrial Strategy has estimated would have been incurred by a participant in delivering each £1 in the ECO3 cost savings attributable to the qualifying action.