Article A35 Overall amounts for purposes of determining total obligationsF1
This article makes provision for the determination of overall amounts for the purposes of determining whether a participant has achieved its—
total home-heating cost reduction obligation under article 35(1)(a) (see paragraphs (2) to (5)); and
total low-income minimum requirement under article 35(1)(b) (see paragraphs (6) to (8)).
Before its final determination under article 35(1)(a), the Administrator must convert the sum of a participant’s scores in accordance with the following steps.
Step 1
Obtain the sum of all the participant’s scores (“A”)
Step 2
Multiply the participant’s total home-heating cost reduction obligation by 0.25 to get an amount (“B”)
Step 3
Subtract B from A to get a further amount (“C”) (where C is a negative number take E at step 5 to be A and go to paragraph (3))
Step 4
Multiply C by 1.716 to get an amount (“D”)
Step 5
Add D to B to get an amount (“E”)
In step 1 in paragraph (2) “scores” includes any scores for measures transferred to the participant under article 33.
E must be added to any amount, as converted, which is reassigned by the participant under article 34A to obtain an overall amount (“F”).
F is the overall amount used for the purposes of determining whether the participant has achieved its total home-heating cost reduction obligation under article 35(1)(a).
Before its final determination under article 35(1)(b) (so far as it relates to article 9(5)(c)), the administrator must take the following steps.
Step 1
Obtain the sum of all the participant’s scores for low-income qualifying actions (“G”)
Step 2
Add G to any amount, as converted, which is reassigned by the participant under article 34A to get an amount (“H”)
In step 1 in paragraph (6) “scores” includes any scores for low-income qualifying actions transferred to the participant under article 33.
H is the overall amount used for the purposes of determining whether the participant has achieved its total low-income minimum requirement under article 35(1)(b).
Annotations
Textual amendments
- F1
Art. A35 inserted (1.8.2025) by The Electricity and Gas (Energy Company Obligation) (Amendment) Order 2025 (S.I. 2025/941), arts. 1(2), 12(d)
Notes on Part 9
Textual amendments
- F1
Pt. 9 heading substituted (1.8.2025) by The Electricity and Gas (Energy Company Obligation) (Amendment) Order 2025 (S.I. 2025/941), arts. 1(2), 12(c)