Regulation 2 Amendment of Regulations
The Electricity (Applications for Consent) Regulations 1990f1 shall be amended as follows.
In regulation 3(1) (interpretation) after “these Regulations-” insert–
““EIA development” has the same meaning as set out in regulation 2(1) of the Electricity Works (Environmental Impact Assessment) (Scotland) Regulations 2000f2;”.
In regulation 11(1) (fee payable on applications for consent) for the Table substitute–
“
TABLE
Subject matter of application for consent Fee 1.Overhead line with a total distance not exceeding 15 km which is not an EIA development
£150.00 2.Overhead line with a total distance not exceeding 15 km which is an EIA development
£2,000.00 3.Overhead line with a total distance–
(a)exceeding 15 km but not exceeding 50 km
£15,000.00 (b)exceeding 50 km but not exceeding 100 km
£25,000.00 (c)exceeding 100 km
£50,000.00 4.Construction or construction and operation of a generating station of megawatt capacity–
(a)not exceeding 100
£15,000.00 (b)exceeding 100 but not exceeding 200
£20,000.00 (c)exceeding 200 but not exceeding 500
£30,000.00 (d)exceeding 500
£50,000.00 5.Extension or extension and operation of a generating station resulting in increase in megawatt capacity–
(a)not exceeding 100
£15,000.00 (b)exceeding 100 but not exceeding 200
£20,000.00 (c)exceeding 200 but not exceeding 500
£30,000.00 (d)exceeding 500
£50,000.00 6.Extension of a nuclear generating station by retrofitting of emission control equipment
£5,000.00 7.Any other extension of a generating station
£1,000.00 8.Operation only or change to manner of operation of a generating station
£1,000.00 ”.
In regulation 11(2) for “heads 3 to 7” substitute “heads 5 to 8”.
Annotations
Footnotes
- f1
-
S.I. 1990/455.
- f2