OpenLegislation

Regulation 2 Amendment of Regulations

Changes not yet applied. Later legislation changes this provision in ways not yet written into the text below:

(1)

The Electricity (Applications for Consent) Regulations 1990f1 shall be amended as follows.

(2)

In regulation 3(1) (interpretation) after “these Regulations-” insert–

  • ““EIA development” has the same meaning as set out in regulation 2(1) of the Electricity Works (Environmental Impact Assessment) (Scotland) Regulations 2000f2;”.

(3)

In regulation 11(1) (fee payable on applications for consent) for the Table substitute–

“

TABLE

Subject matter of application for consentFee
1.

Overhead line with a total distance not exceeding 15 km which is not an EIA development

£150.00
2.

Overhead line with a total distance not exceeding 15 km which is an EIA development

£2,000.00
3.

Overhead line with a total distance–

(a)

exceeding 15 km but not exceeding 50 km

£15,000.00
(b)

exceeding 50 km but not exceeding 100 km

£25,000.00
(c)

exceeding 100 km

£50,000.00
4.

Construction or construction and operation of a generating station of megawatt capacity–

(a)

not exceeding 100

£15,000.00
(b)

exceeding 100 but not exceeding 200

£20,000.00
(c)

exceeding 200 but not exceeding 500

£30,000.00
(d)

exceeding 500

£50,000.00
5.

Extension or extension and operation of a generating station resulting in increase in megawatt capacity–

(a)

not exceeding 100

£15,000.00
(b)

exceeding 100 but not exceeding 200

£20,000.00
(c)

exceeding 200 but not exceeding 500

£30,000.00
(d)

exceeding 500

£50,000.00
6.

Extension of a nuclear generating station by retrofitting of emission control equipment

£5,000.00
7.

Any other extension of a generating station

£1,000.00
8.

Operation only or change to manner of operation of a generating station

£1,000.00

”.

(4)

In regulation 11(2) for “heads 3 to 7” substitute “heads 5 to 8”.

Annotations

Footnotes

f1

S.I. 1990/455.

f2

S.S.I. 2000/320.