Regulation 11 Fees payable on applications for consent

Changes not yet applied. Later legislation changes this provision in ways not yet written into the text below:

(1)

Subject to paragraph (2), the fee to be paid to the Secretary of State upon application being made for a consent under section 36 or section 37 shall be as specified in the Table below.

TABLE

Subject matter of application for consentFee
Overhead line£50.00
Generating station
1

Construction or construction and operation of non-nuclear station of megawatt capacity —

(a)

not exceeding 200

£5000.00
(b)

exceeding 200 but not exceeding 500

£12000.00
(c)

exceeding 500

£20000.00
2

Construction or construction and operation of nuclear station of megawatt capacity —

(a)

not exceeding 200

£10000.00
(b)

exceeding 200 but not exceeding 500

£24000.00
(c)

exceeding 500

£40000.00
3

Extension or extension and operation of non-nuclear station resulting in increase in megawatt capacity —

(a)

not exceeding 200

£5000.00
(b)

exceeding 200 but not exceeding 500

£12000.00
(c)

exceeding 500

£20000.00
4

Extension or extension and operation of nuclear station resulting in increase in megawatt capacity —

(a)

not exceeding 200

£10000.00
(b)

exceeding 200 but not exceeding 500

£24000.00
(c)

exceeding 500

£40000.00
5

Extension of station by retrofitting of emission control equipment

£5000.00
6

Any other extension of station

£1000.00
7

Operation only or charge to manner of operation of station

£1000.00
(2)

Where the subject matter of an application for a consent under section 36 is two or more of the matters specified under heads 3 to 7 in the Table above, the fee to be paid shall be the higher or highest of the relevant fees there specified.