Paragraph 2 I1

Northern Ireland

An outline statement of the business proposals, for the business of the applicant to which the application relates, for the next five years which includes:

(a)

particulars of the person or persons from whom, and the points at which, the applicant expects to receive the electricity which he will transmit; particulars of transmission of the electricity; particulars of the expected points of off-take, and quantities;

(b)

interconnections to other transmission systems F1or distribution systems ;

(c)

proposed metering arrangements;

(d)

schedule of generating plant owned by the applicant including;

(i)

pumped storage

(ii)

clutched gas turbine generators/synchronous compensators;

(e)

forecast annual maximum demands in his transmission system (GW) and energy (GWh) to be transmitted;

(f)

summary large scale map, together with detailed maps providing information on areas where activities are concentrated as necessary;

(g)

a single line diagram of the transmission system showing all transmission voltage levels and distinguishing from overhead lines, electric lines which are or will be placed underground; F2...

(h)

annual forecasts of costs, sales and revenues and project financing, stating the assumptions underlying the figures provided.

Annotations

Textual amendments

F1

Words in Sch. 3 Pt. II para. 2(b) inserted (15.4.2011) by The Gas and Electricity (Internal Markets) Regulations (Northern Ireland) 2011 (S.R. 2011/155), regs. 1, 33(f)(i)

F2

Word in Sch. 3 Pt. II para. 2(g) omitted (15.4.2011) by virtue of The Gas and Electricity (Internal Markets) Regulations (Northern Ireland) 2011 (S.R. 2011/155), regs. 1, 33(f)(ii)

Commencement

I1

Sch. 3 para. 2 in operation at 24.5.2007, see reg. 1