Paragraph 2 Regulation 11 (meaning of auction parameters)I1
England, Wales and Scotland
In regulation 11(1)(b), before “target capacity” insert “auction”.
In regulation 11(3)—
in the definition of “15 year minimum £/kW threshold”, after “a generating CMU” insert “or an unproven demand side response CMU”;
in the definition of “3 year minimum £/kW threshold”, after “a generating CMU” insert “or an unproven demand side response CMU”; and
after the definition of “3 year minimum £/kW threshold” insert—
““auction target capacity” means, in respect of a capacity auction, the portion of the target capacity in relation to the capacity year corresponding to the delivery year for which the capacity auction is to be held which should be used for that capacity auction.”
Annotations
Commencement
- I1
Sch. 1 para. 2 in force at 4.7.2020, see reg. 1(2)