Article 4 Conditions on exemption
The exemption granted by article 3 of this Order is subject to compliance with the following conditions—
(a)
Kype Muir Extension Wind Farm is connected to the total system;
(b)
Kype Muir Extension Wind Farm does not export more than 100 megawatts of electrical power to the total system, except in circumstances outside the reasonable control of Banks Renewables (Harting Rig Wind Farm) Limited; and
(c)
Banks Renewables (Harting Rig Wind Farm) Limited does not hold a licence under section 6(1)(a) of the Act in relation to Kype Muir Extension Wind Farm.