OpenLegislation

Article 4 Conditions on exemptions

Original text. Later amendments are not shown.

The exemption granted by article 3(a) of this Order is subject to compliance with the following conditions—

(a)

Kemsley Generating Station is connected to the total system in England and Wales;

(b)

Kemsley Generating Station does not export more than 100 megawatts of electrical power to the total system in England and Wales, except in circumstances outside the reasonable control of K3 CHP Limited; and

(c)

K3 CHP Limited is not a licensed generator.