Article 5 Conditions on exemptions

Original text. Later amendments are not shown.

The exemption granted by article 3(b) of this Order is subject to compliance with the following conditions—

(a)

Ferrybridge Multifuel 2 Generating Station is connected to the total system in England and Wales;

(b)

Ferrybridge Multifuel 2 Generating Station does not export more than 100 megawatts of electrical power to the total system in England and Wales, except in circumstances outside the reasonable control of Ferrybridge MFE 2 Limited; and

(c)

Ferrybridge MFE 2 Limited is not a licensed generator.