Article 4 Conditions on exemptions

Original text. Later amendments are not shown.

The exemption granted by article 3(a) of this Order is subject to compliance with the following conditions—

(a)

Blackcraig Wind Farm is connected to the total system;

(b)

Blackcraig Wind Farm does not export more than 100 megawatts of electrical power to the total system, except in circumstances outside the reasonable control of Blackcraig Wind Farm (Scotland) Limited; and

(c)

Blackcraig Wind Farm (Scotland) Limited is not a licensed generator in respect of Blackcraig Wind Farm.