Paragraph 1 F1
The carrying out of development (other than development which is Schedule 1 development) to provide any of the following—
a generating station; F2or
an electric line installed above ground—
with a voltage of 132 kilovolts or more;
in a sensitive area; or
the purpose of which installation is to connect the electric line to a generating station the construction or operation of which requires consent under section 36 of the Electricity Act F31989.