Section 165 Grants and loansC7C9I1C1C2C3C4C5C6C8C10
England, Wales and Scotland
This section applies where an energy administration order has been made in relation to a company.
The Secretary of State may make grants or loans to the company of such amounts as it appears to him appropriate to pay or lend for achieving the objective of the energy administration.
A grant or loan under this section may be made in whatever manner, and on whatever terms, the Secretary of State considers appropriate.
The terms on which a grant may be made under this section include, in particular, terms requiring the whole or a part of the grant to be repaid to the Secretary of State if there is a contravention of the other terms on which the grant is made.
The terms on which a loan may be made under this section include, in particular, terms requiring—
the loan to be repaid at such times and by such methods, and
interest to be paid on the loan at such rates and at such times,
as the Secretary of State may from time to time direct.
The consent of the Treasury is required—
for the making of a grant or loan under this section; and
for the giving by the Secretary of State of a direction under subsection (5).
The Secretary of State must pay sums received by him by virtue of this section into the Consolidated Fund.
Annotations
Modifications
- C1
Ss. 154-171 modified (1.10.2005) by Energy Administration Rules 2005 (S.I. 2005/2483), rules 1, 184 (with rules 3, 187)
- C2
Ss. 156-167 applied (with modifications) (18.12.2011) by Energy Act 2011 (c. 16), ss. 96(1)-(4), 121(3)
- C3
Ss. 154-171 modified (7.6.2013) by The Energy Supply Company Administration Rules 2013 (S.I. 2013/1046), rules 1, 205(2)-(4) (with rules 3, 208)
- C4
Ss. 156-167 applied (with modifications) (23.7.2018) by Smart Meters Act 2018 (c. 14), ss. 4(1)-(4), 14(5)
- C5
Ss. 154-171 modified (E.W.) (1.8.2020) by The Smart Meter Communication Licensee Administration (England and Wales) Rules 2020 (S.I. 2020/629), rules 1, 3(2)-(4) (with rule 4(1))
- C6
Ss. 156-167 applied (with modifications) (31.3.2022 for specified purposes, 1.6.2022 in so far as not already in force) by Nuclear Energy (Financing) Act 2022 (c. 15), ss. 33(1)-(5), 44(1)(c)(2)(c)
- C7
Pt. 3 Ch. 3: power to modify conferred (31.3.2022 for specified purposes, 1.6.2022 in so far as not already in force) by Nuclear Energy (Financing) Act 2022 (c. 15), ss. 38, 44(1)(c)(2)(c)
- C8
Ss. 156-167 power to apply (with modifications) conferred (26.10.2023) by Energy Act 2023 (c. 52), s. 334(2)(l), Sch. 18 para. 50
- C9
Pt. 3 Ch. 3 power to apply and modify conferred (26.12.2023) by Energy Act 2023 (c. 52), ss. 48, 334(3)(a)
- C10
Ss. 156-167 applied (with modifications) (26.12.2023) by Energy Act 2023 (c. 52), ss. 44, 334(3)(a)
Commencement
- I1
S. 165 in force at 5.10.2004 by S.I. 2004/2575, art. 2(1), Sch. 1