Article 75 Final progress reportsI1
England and Wales
(1)
In this Part reference to a progress report is to a report in the form specified in Rule 32.
(2)
The final progress report means a progress report which includes a summary of—
(a)
the energy administrator’s proposals;
(b)
any major amendments to, or deviations from, those proposals;
(c)
the steps taken during the energy administration; and
(d)
the outcome.
Annotations
Commencement
- I1
Rule 75 in force at 1.10.2005, see rule 1