Regulation 21A EstimatesF1

(1)

Where a responsible undertaking uses an estimate in accordance with these Regulations it must record

(F2a)

details of the method used to make the estimate F3, and

(F4b)

the data used to make this estimate.

(2)

Where a responsible undertaking uses an estimate in accordance with regulations 23(7), 25A(2), 25B(3) or 26(7)(b) it must—

(a)

notify the scheme administrator that an estimate was used, and

(b)

record in the evidence pack, the reasons why an estimate was used.

Annotations

Textual amendments

F1

Reg. 21A inserted (29.11.2023) by The Energy Savings Opportunity Scheme (Amendment) Regulations 2023 (S.I. 2023/1182), regs. 1(2), 10

F2

Words in reg. 21A(1) renumbered as reg. 21A(1)(a) (22.7.2026) by The Energy Savings Opportunity Scheme (Amendment) Regulations 2026 (S.I. 2026/701), regs. 1(2), 9(a)

F3

Word in reg. 21A(1)(a) inserted (22.7.2026) by The Energy Savings Opportunity Scheme (Amendment) Regulations 2026 (S.I. 2026/701), regs. 1(2), 9(b)

F4

Reg. 21A(1)(b) inserted (22.7.2026) by The Energy Savings Opportunity Scheme (Amendment) Regulations 2026 (S.I. 2026/701), regs. 1(2), 9(c)