OpenLegislation

Paragraph 37 Topography of the site: data on landfill bodyF1

The topography of the site and settling behaviour of the landfill body must be monitored in accordance with Table 13.

Table 13

Operating phaseAfter-care phase
(1)

Data for the status plan of the landfill: surface occupied by waste, volume and composition of waste, methods of depositing, time and duration of depositing, calculation of the remaining capacity still available at the landfill.

Structure and composition of landfill bodyf1Yearly
Settling behaviour of the level of the landfill bodyYearlyYearly reading

Annotations

Textual amendments

F1

Sch. 13 inserted (1.11.2025) by The Environmental Authorisations (Scotland) Amendment Regulations 2025 (S.S.I. 2025/165), reg. 1(2), sch. 4 (with sch. 23)

Footnotes

f1

(1)

Data for the status plan of the landfill: surface occupied by waste, volume and composition of waste, methods of depositing, time and duration of depositing, calculation of the remaining capacity still available at the landfill.