Paragraph 37 Topography of the site: data on landfill bodyF1
The topography of the site and settling behaviour of the landfill body must be monitored in accordance with Table 13.
Table 13
| Operating phase | After-care phase | |
|---|---|---|
(1) Data for the status plan of the landfill: surface occupied by waste, volume and composition of waste, methods of depositing, time and duration of depositing, calculation of the remaining capacity still available at the landfill. | ||
| Structure and composition of landfill bodyf1 | Yearly | |
| Settling behaviour of the level of the landfill body | Yearly | Yearly reading |
Annotations
Textual amendments
- F1
Sch. 13 inserted (1.11.2025) by The Environmental Authorisations (Scotland) Amendment Regulations 2025 (S.S.I. 2025/165), reg. 1(2), sch. 4 (with sch. 23)
Footnotes
- f1
(1)
Data for the status plan of the landfill: surface occupied by waste, volume and composition of waste, methods of depositing, time and duration of depositing, calculation of the remaining capacity still available at the landfill.