Paragraph 7 F1
Processing of ferrous metals—
(a)
operation of hot-rolling mills with a capacity exceeding 20 tonnes of crude steel per hour,
(b)
operation of smitheries with hammers the energy of which exceeds 50 kilojoule per hammer, where the calorific power used exceeds 20 MW,
(c)
application of protective fused metal coats with an input exceeding 2 tonnes of crude steel per hour.
Annotations
Textual amendments
- F1
Sch. 20 inserted (1.11.2025) by The Environmental Authorisations (Scotland) Amendment Regulations 2025 (S.S.I. 2025/165), reg. 1(2), sch. 11 (with sch. 23)