OpenLegislation

Paragraph 1 F1

England and Wales

A description of the improvement works, including in particular—

(a)

a description of the location of the improvement works;

(b)

a description of the physical characteristics of the whole of the improvement works, including, where relevant, requisite demolition works, and the land-use requirements during the construction and operational phases;

(c)

a description of the main characteristics of the operational phase of the improvement works (in particular any production process), for instance, energy demand and energy used, nature and quantity of the materials and natural resources (including water, land, soil and biodiversity) used;

(d)

an estimate, by type and quantity, of expected residues and emissions (such as water, air, soil and subsoil pollution, noise, vibration, light, heat, radiation) and quantities and types of waste produced during the construction and operation phases.

Annotations

Textual amendments

F1

Sch. 1 substituted (16.5.2017) by The Environmental Impact Assessment (Land Drainage Improvement Works) (Amendment) Regulations 2017 (S.I. 2017/585), reg. 1(1), Sch. 1 (with reg. 22)