OpenLegislation

Schedule 1 Amendment of Schedule 3 to the Principal RegulationsF1

England and Wales Repealed

“PART 4

Exempt flood risk activities: descriptions and conditions

General and interpretation

1.

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Electrical cable services

2.

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Service crossings below the bed of a main river

3.

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Service crossings attached to the outside of existing structures over a main river

4.

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Footbridges

5.

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Temporary scaffolding in England

6.

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Temporary dewatering in England

7.

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Maintenance of raised river or sea defences

8.

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Maintenance of structures within the channel of a main river

9.

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Drinking bays

10.

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Access platforms

11.

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Outfalls

12.

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Repair and protection of banks using natural materials

13.

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Repair of bank slips and erosion

14.

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Channel habitat structures made of natural materials

15.

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Rafts for surveys

16.

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Gravel-cleaning for fish-spawning beds

17.

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Placement of stones or logs in a main river in England for habitat enhancement

18.

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Eel pass devices

19.

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Fish passage notches

20.

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Removal of silt, sand and other material in England

21.

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Removal of silt and sand adjacent to in-river structures in England

22.

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Dredging of man-made ditches, land drains, agricultural drains and previously straightened watercourses in England

23.

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Dredging of any main river in England

24.

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Excavation of scrapes and shallow wetland features

25.

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Raised flood defences in England

26.

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Bankside wildlife refuge structures

27.

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Improvement works for tracks and paths

28.

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .”

Annotations

Textual amendments

F1

Regulations revoked in part (1.1.2017) by The Environmental Permitting (England and Wales) Regulations 2016 (S.I. 2016/1154), reg. 1(1), Sch. 28 (with regs. 1(3), 77-79, Sch. 4)